TIP Amendments
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-28
Approved
|
Admin. Mod |
5 |
$73,000 |
9/10/08 |
9/12/08 |
N/A |
| Administrative modification 07-28 updates the project listing
and funding for 5 projects with a net funding change of $73,000. The significant
changes in this revision include combining the Doyle Drive Congestion
Tolling project (SF-070043) into the Doyle Drive Replacement project
(SF-991030) and adding 73,000 in RIP-TE funds to the San Mateo – El Camino
Real betn. Broadway & Brewster project (SM-070001) from the existing reserve. |
07-27
Approved
|
Admin. Mod |
34 |
$901,463 |
8/21/08 |
9/5/08 |
N/A |
| Administrative modification 07-27 updates the project listing
and funding for 34 projects with a net funding change of $901,463. The
significant changes in this revision include updating the project list and
costs for Grouped Listing for JARC FY 06 – Small UA and Rural projects
(REG070012) and combining two projects (Fairfield Transportation Assistance – SOL070016
and Solano County Kids Shuttle – SOL070017) into the Grouped Listing, with
a net change of $166,402. The cost of the Acquire 62 Bus Catalyst Devices
project (CC-030017) went up by $160,000. |
07-26
Approved
|
Amend |
14 |
$23,484,173 |
7/23/08 |
8/26/08 |
9/12/08 |
| Amendment 07-26 updates the project listing and funding for four
existing projects; adds eight new air-quality exempt projects to the 2007 TIP;
splits one project, and deletes one project from the 2007 TIP. Some of the
significant changes in the amendment are the addition of $11.6 million in federal
Highway Safety Improvement Program funds for FY10 and FY11; the addition of
a new grouped listing for US 206 recreational grants program in the amount
of $1.6 million and the addition of two new projects funded by the $240,000
in Eastern Solano CMAQ funds. The revision also deletes the Rumrill Bridge
Replacement project, as it was a duplicate TIP listing. |
07-25
Approved
|
Amend |
41 |
$10,714,240 |
6/25/08 |
8/18/08 |
9/5/08 |
| Amendment 07-25 updates the project listing and funding for 33 existing projects; adds six new air-quality exempt projects to the 2007 TIP and deletes two projects from the 2007 TIP. The net funding change in this amendment is $10,714,240. The significant changes in this revision include: Decreasing the funding for the Golden Gate Bridge Seismic Retrofit, Ph: 3B by $130.2 million to reflect the new Highway Bridge Program (HBP) listing numbers generated by Caltrans; as well as decreasing the funding for Golden Gate Bridge Seismic Retrofit, Ph: 1-3A project by $48.1 million for the same reason. Additionally, the BART Seismic Retrofit Program was increased $44.7 million to reflect the new HBP listing. There was a transfer of funds between the Sonoma and Marin US 101 Marin/Sonoma Narrows projects. The Sonoma project (SON07004) decreased by $46.3 million while the Marin project (MRN050034) increased by $60.4 million due to addition of State funds outside the TIP years.
|
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-24
Approved
|
Amend |
137 |
$825,593,278 |
3/26/08 |
4/18/08 |
5/12/08 |
| Amendment 07-24 is the annual all transit TIP Amendment. The
amendment constrains the FY 2007-08 Federal Transit Administration (FTA) Section
5307 and Section 5309 programs to actual appropriations, adds FTA funded earmarks,
and makes adjustments to other previously programmed FTA-funded projects. The
amendment also adds the FY 2008-09 FTA Section 5307 and Section 5309 programs
to the TIP, which total approximately $350 million. The amendment also updates
the grouped listing for the FTA Section 5311 program. |
07-23
Approved |
Amend |
25 |
$9,994,518 |
3/26/08 |
4/17/08 |
5/12/08 |
| Amendment 07-23 updates the project listing and funding for 22
existing projects and adds three new air-quality exempt projects to the 2007
TIP. Some of the significant changes in the amendment are as follows: 1) Adds
prior-year federal earmark funds totaling $496,000 to the Almaden Expressway
Pedestrian Overcrossing project. 2) Redirects $13 million from the Transportation
for Livable Communities (TLC)/Housing Incentive Program (HIP) and the regional
exchange programs pursuant to Commission action on the Third Cycle Congestion
Mitigation and Air Quality Improvement (CMAQ) Bonus. 3) Redirects $2.47 million
from the Latham & Telegraph Pedestrian Improvement project to five other
Oakland TLC/HIP projects at the request of the City of Oakland. |
07-22
Approved |
Admin. Mod |
33 |
$763,391 |
4/17/08 |
4/18/08 |
N/A |
Administrative modification 07-22 updates the project listing
and funding for revisions to 33 projects with a net funding change of $763,391.
The significant changes in this revision include updates to the Emergency
Response and Highway Bridge Program Grouped Listings and moving $1.2M from
the Ed Roberts Intermodal Transit Center project in TE funds to the BART
sponsored project (ALA050065).
|
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-21
Approved
|
Amend |
33 |
$252,852,690 |
2/27/08 |
4/3/08 |
4/23/08 |
| Amendment 07-21 updates the project listing and funding for
29 projects and adds four new projects to the 2007 TIP and one new grouped
listing. Two of the projects are the results of projects being split into phases.
The grouped listing is funded with New Freedom funds for FY2006. The revision
has a net funding change of over $252.852 million. Some of the significant
changes in the amendment are as follows: the project cost for the San Francisco-Oakland
Bay Bridge project has increased by $179.2 million; $16.695 million has been
added to San Francisco Municipal Railway (MUNI)'s Miscellaneous Security Improvements & Graffiti
Prevention project and $15.289 million to the Grouped Listing for SHOPP Emergency
Response projects. |
07-20
Approved |
Admin. Mod. |
28 |
$2,323,377 |
1/23/08 |
2/14/08 |
N/A |
| Administrative modification 07-20 makes minor funding revisions
to 28 projects with a net funding change of $2.32 million. The significant
changes in this revision include transfers of $2million from the I-680 SB HOV
Lane Gap Closure project to I-680 HOV Southbound Lane Extension project and
the $2M in STIP Augmentation funds from the BART sponsored TIP listing for
the Ed Roberts Campus project to the Berkeley sponsored TIP listing for the
Ed Roberts Campus project (ALA050081). |
07-19
Approved |
Amend |
15 |
$36,304,335 |
1/23/08 |
4/2/08 |
4/23/08 |
| Amendment 07-19 updates the project listing and funding for
15 projects with a net funding change of over $36.3 million. The amendment
added three new projects to the 2007 TIP and adds $12 Million in local funds
to the construction phase of the East 14th St/Mission Blvd Streetscape Improvements
project, in the outer years of the TIP. The amendment makes other major revisions
to projects throughout the region. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-18
Approved
Related documents |
Amend |
12 |
$116,081,000 |
12/19/07 |
12/28/07 |
1/11/08 |
| Amendment 07-18 programs $159 million in US DOT Urban Partnership
Program (UPP) Grants into 11 projects in San Francisco, Marin and Alameda Counties.
The amendment also updates the scope and funding of the LAVTA BRT project in
Alameda County. |
07-17
Approved |
Amend |
53 |
$59,873,820 |
12/19/07 |
12/28/07 |
1/9/08 |
| Amendment 07-17 adds twenty-six new projects in the Transportation
for Livable Communities (TLC), Housing Incentive Program (HIP) and Regional
Bicycle and Pedestrian projects into the 2007 TIP. The new projects add $9.9
million in CMAQ funds, $1.14 million in RIP and $480,000 in FTA funds. It also
reduced the funding level for two Caltrans Managed lump sum SHOPP project listings
by $123 million and makes other major revisions to projects throughout the
region. |
07-16
Approved |
Admin. Mod. |
55 |
$4,097,314 |
12/26/07 |
12/27/07 |
N/A |
| Administrative modification 07-16 updates the project listing
and funding for 55 projects with a net funding change of $4.1M. It revises
funding for several projects for financial constraint reconciliation purposes,
moving funds previously programmed in FY 2007-08 to FY 2006-07 to reflect the
fund obligation advances made. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-15
Approved |
Admin. Mod. |
8 |
$4,752,195 |
9/12/07 |
9/17/07 |
N/A |
| Amendment 07-15 split three three projects from the TransLink
Project listing to facilitate the fund obligation of the UPP ITS projects.
It also revised fund source and funding for the 511 Traveler Information project,
a City CarShare project, the FTA Non-Urbanized Projects and the Safe Route
to School lump sum project. |
07-14
Approved |
Amend |
62 |
$255,000,000 |
9/26/07 |
10/22/07 |
11/1/07 |
| Amendment 07-14 updates the project listing and funding for
62 projects with a net funding change of over $255 million. The amendment adds
$40.2 million to the Fifth Street Bridge retrofit project in Oakland, $336
million to 3 Caltrans SHOPP projects, removes $170 million in local funds from
a VTA project and makes other major revisions to projects throughout the region. |
07-13
Approved |
Admin. Mod. |
24 |
$1,048,000 |
8/31/07 |
9/5/07 |
N/A |
| Amendment 07-13 exchanges $7.8m in STP funds for RIP funds for
the AC Transit ZEB project and makes other minor revisions to project descriptions,
funding and project delivery schedules throughout the region. |
07-12
Approved |
Amend |
1 |
$24,999,999 |
7/25/07 |
8/22/07 |
8/28/07 |
| Amendment 07-12 is a formal amendment that adds $24.9 million
in new Public-Private Partnership Pilot Program (Penta-P) funds to the BART:
Oakland Airport Connector Project. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-11
Approved |
Admin. Mod. |
19 |
$2,500,000 |
8/2/07 |
8/13/07 |
N/A |
| Amendment 07-11 completes the Marin County Non-motorized Transportation
Pilot Program Lump Sum project listing split to allow for better project management.
The amendment also exchanges $7.8m in RIP funds between projects in Alameda
County, updates the Caltrans Highway Bridge Program Lump Sum project listings
and makes several other minor scope and funding modifications to projects thorughout
the region. |
07-10
Approved |
Amend |
31 |
$94,000,000 |
6/27/07 |
7/25/07 |
8/21/07 |
| TIP Amendment 07-10 is a formal amendment that adds several
Regional Bike Pedestrian Program projects into the 2007 TIP. The amendment
also updated all the SHOPP lump sum project listings as approved by the CTC. |
07-09
Approved |
Admin. Mod. |
28 |
$2,600,000 |
6/12/07 |
6/15/07 |
N/A |
| Amendment 07-09 is an administrative amendment that makes minor
revisions to several Lifeline Transportation Program projects and other projects throughout
the region. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-08
Approved |
Amend |
50 |
$21,024,358 |
4/25/07 |
5/11/07 |
5/17/07 |
|
Amendment 07-08 is the Regions
annual Program of Project TIP amendment. The
amendment constraints program FTA 5307 and
5309 funds to FY2006-07 Federal Appropriations. |
07-07
Approved |
Admin. Mod. |
1 |
$2,149,000 |
3/23/07 |
3/26/07 |
N/A |
|
TIP Amendment 07-07 revised
the Highway Bridge Program Lump Sum adding
$2m to the Cordelia Bridge Project in Solano
County. |
07-06
Approved
Related documents |
Amend |
165 |
$8,434,458,660 |
5/23/07 |
5/2907 |
6/14/07 |
|
Amendment 07-06 demonstrates
the TIP’s compliance with SAFETEA, establishing
the TIP as being a 4 year document. The amendment
also added Proposition 1B funds, STIP Augmentation
funds and other funds to existing and new projects
throughout the region. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-05
Approved |
Admin. Mod. |
31 |
$119,518,763 |
03/09/07 |
3/16/07 |
N/A |
|
Amendment 07-05 revised funding
amounts for several projects for financial
constraint purposes, advancing funds previously
programmed in fiscal year 2007-08 to fiscal
year 2006-07 to enable fund obligation this
fiscal year. Amendment 07-05 also combined
the BART Preventive Maintenance Project and
the BART CAR Replacement Exchange Project to
ease program management and made several other
minor corrections to projects throughout the
region. |
07-04
Approved |
Amend |
80 |
$100,253,457 |
12/21/06 |
1/12/07 |
1/26/07 |
|
Amendment 07-04 is a major amendment
that adds several new projects funded through
the Lifeline transportation program including Job Access Reverse
Commute (JARC) and Congestion Mitigation and
Air Quality Improvement (CMAQ) funds and local
matching funds, and Regional Bicycle and Pedestrian
Program funds. The Amendment adds $261 million
in future funds to the US 101 at State Route
25 Interchange and Widening project in Santa
Clara County to reflect the total project cost
estimates as required by federal regulations.
It also updates the Railroad Crossing lump
sum project listing reflecting the addition
of fiscal year 2006-07 and 2007-08 state-approved
projects, adds new local streets and roads
projects in San Mateo County and makes other
funding and schedule revisions to projects
throughout the region. |
07-03
Approved |
Admin. Mod. |
44 |
$5,618,732 |
12/20/06 |
12/21/06 |
N/A |
|
Amendment 07-03 is a minor change
amendment that revised the funding for several
projects for financial constraint purposes,
moving funds previously programmed in fiscal
year 2006-07 to fiscal year 2005-06 to reflect
fund obligation advances made during the last
fiscal year. The amendment also updated the
total projects costs and made other minor scope
changes for projects throughout the region. |
Revision (PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
07-02
Approved |
Amend |
2 |
$531 |
11/15/06 |
12/8/06 |
12/11/06 |
|
Amendment 07-02 made funding revision
by moving funds currently programmed in fiscal
year 2005-06 into the current fiscal year for
the Union City Intermodal Station project in
Alameda County and the State Route 152/SR-156
Interchange Improvement project in Santa Clara
County in order to allow federal fund obligation. |
07-01
Approved |
Admin. Mod. |
16 |
$1,601,594 |
10/31/06 |
11/1/06 |
N/A |
|
Amendment 07-01 was a minor
change amendment approved by MTC’s Executive
Director on November 30, 2006. It made revisions
to project funding and phase for several projects
thoroughout the regions. |
07-00
Approved |
Update |
951 |
$10,936,328,000 |
7/26/06 |
8/31/06 |
10/2/06 |
|
Adoption of the 2007 Transportation
Improvement Program (TIP). |
Back to main TIP page |
|