2011 TIP Revisions
Revision Notification List
To receive updates by email, send your email address and affiliation
to: tipinfo@mtc.ca.gov.
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-31
Proposed |
Amendment |
225 |
$111,327,744 |
12-19-12
|
Pending |
Pending |
| Amendment 11-31 revises 225 projects with a net increase in funding of $111.3 million. Among other changes, the revision: amends in the following ten exempt projects: 1) AC Transit- Farebox Replacement - totaling $9.4 million; 2) CCCTA- Replace Diesel Trolleys with Electric Trolley Buses totaling $5.4 million; 3) Canal Road Bicycle and Pedestrian Improvement totaling $1.9 million; 4) Mountain View Road Bridge Replacement totaling $1.3 million; 5) East San Jose Pedestrian Improvements totaling 2.7 million; 6) SFMTA- Improvements to 8X Bayshore totaling $11.7 million; 7) Crystal Springs Regional Trail (CSRT) South of Hwy 92 Conversion project totaling $1.4 million; 8) North Central Pedestrian Improvement Program totaling $424,924; 9) Middlefield Road and Woodside Road Intersection Improvements totaling $424,924; and 10) Vallejo Downtown Streetscape - Phase 3 totaling $2.3 million; amends in one new grouped listing - GL: Roadway Preservation in Solano County totaling $1.3 million; updates the funding plan of the Yerba Buena Island (YBI) Ramp Improvements project (SF-070027) to reflect the latest programming information from Caltrans with a total project cost increase of $36 million; archives 165 projects from the TIP because the funds have been obligated or the projects have been completed; archives 29 grouped listings because all the projects within the respective listings have been completed; and deletes the Caltrans managed High Risk Rural Road Program (VAR110006) as all the projects are part of the Highway Safety Improvement Program grouped listing and updates the funding plan and back-up listing of the following two Caltrans managed grouped listings to reflect the latest information from Caltrans. The grouped listings are as follows: GL: Safety Improvements – Highway Safety Improvement Program (VAR110007) with a net increase in funds of $19.7 million; and GL: Bridge Rehabilitation/ Reconstruction – Highway Bridge Program (VAR110045) – with a net increase in funds of $63.2 million. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements. |
11-29
Approved |
Administrative Modification |
44 |
$26,314,309 |
12-20-12
|
N/A |
N/A |
| TIP Revision No. 2011-29 revises 44 projects with a net increase in funding of $26.3 million. Among other changes, this revision: updates the funding plans of 16 Surface Transportation Program/Congestion Mitigation Air Quality Improvement (STP/CMAQ) funded projects to reflect the obligation of these funds; updates the funding plans of 4 State Transportation Improvement Program funded projects to reflect California Transportation Commission allocations; updates the funding plans of San Francisco City and County’s, Santa Clara County’s and Solano County’s Regional Planning Activities projects (SCL090035, SF-090030, and SOL090006), Valley Transportation Authority’s (VTA) San Tomas Expressway Box Culvert Rehabilitation project (SCL090002) and Sonoma Marin Area Rail Transit’s Sonoma Marin Area Rail Corridor project (SON090002) to reflect the programming of CMAQ funds; updates the funding plans and back-up listings of 5 State Highway Operation and Protection Program (SHOPP) grouped listings and updates the funding plans of 6 individually listed Highway Bridge Program (HBP) funded projects to reflect the latest information from Caltrans; updates the funding plan and back-up listing of the Job Access and Reverse Commute Fiscal Year 2011-12 Large Urbanized Area grouped listing (REG110032); updates the funding plan of the Golden Gate Bridge Highway and Transportation District’s Advanced Communications and Information System Radio Communications System project (MRN010035) to add funds programmed through the Lifeline Transportation Program; updates the funding plan of VTA’s Together We Ride One-Call/One-Click project (SCL110120) to reflect the award of Federal Transit Administration (FTA) grants; and updates the funding plans of two of San Jose’s projects to reflect the transfer of $50,000 in STP/CMAQ funds from the Los Gatos Creek Reach 5 Bridge Crossing project to the San Carlos Multimodal Phase 2 project (SCL110029 and SCL110034). The administrative modification is financially constrained by year and MTC relies on the State’s programming capacity in the amount of $600,000 in HBP funds, $2.9 million in Proposition 1B funds, $14.4 million in SHOPP funds and $400,000 in FTA funds. MTC will update the financial plan to reflect the additional revenues with the next amendment. MTC’s 2011 TIP, as revised with Revision No. 2011-29, remains in conformity with the applicable State Implementation Plan (SIP) for air quality and the revision does not interfere with the timely implementation of the Transportation Control Measures contained in the State Implementation Plan (SIP). |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-28
Approved |
Amendment |
59 |
$795,670,178 |
9-26-12
|
10-4-12 |
10-25-12 |
| Amendment 11-28 makes revisions to 59 projects
with a net increase in funding of $795.7 million. Among other
changes, the revision: updates the funding plan of the San
Francisco-Oakland Bay Bridge project to add in $40.6 million
in State Highway Operation and Protection Program (SHOPP)
facilities to reconstruct maintenance facilities; updates
the funding plan of the State Route 1 Devils Slide Bypass
project to add in $182 million in FY 2012 Emergency Relief
funds; adds the San Francisco Bay Bridge Gateway Park project
to the TIP with $30 million Regional Improvement Program
(RIP) funds, $17 million Bridge toll funds, $6 million other
local funds, and $84 million long-range plan (RTP-LRP) funds
totaling $137 million; updates the funding plan of the Caltrain
Express: Phase 2 project to reprogram all long range plan
(RTP-LRP) funds to FY17, remove all Other Federal funds,
and scope as it is part of the Caltrain Positive Train Control
project; updates the funding plan of the Caltrain Positive
Train Control Project; amends the funding plan of the Doyle
Drive project to reflect the allocation of $81.2 million
in State Highway Account funds; updates the funding plan
of the Outer Harbor Intermodal Terminals (OHIT) project to
clarify scope, add in $15 million in TIGER funds and revises
the fund source of $242.1 million from Other Local funds
to in Prop-1B-TCIF funds; amends in the Oakley to Port Chicago,
Track Segment 3, Phase 2 project with $20.5 million in Interregional
Improvement Program funds; amends in the following six exempt
projects (1. Samtrans - Replace 62 1998 Gillig Buses totaling
$36 million; 2. Climate Initiatives Program totaling 19.2
million; 3. Vacaville Transit - Curb Ramps totaling $50,000;
4. San Leandro BART - Transit Access Improvements totaling
$3.9 million; 5. Regional Real-Time Transit Information at
BART; and 6. VTA - Together We Ride One-Call/One-Click project
totaling $2.1 million); deletes four duplicate projects from
the TIP; and updates the funding plan and back-up listing
of eight Caltrans managed grouped listings to reflect the
latest information from Caltrans and splits out the programming
for fiscal years 2013 onwards to form new listings, per Caltrans’ request,
with a net increase in SHOPP programming of $254.4 million.
The grouped listings are as follows – 1. GL: Safety
Improvements – Highway Safety Improvement Program (REG070009,
VAR110007); 2. GL: Safety Improvements – Safe Routes
to School Program (REG090001, VAR110012); 3. GL: Pavement
Resurfacing/Rehabilitation – SHOPP Roadway Preservation
(MTC050009, VAR110003); 4. GL: Safety Improvements – SHOPP
Collision Reduction (MTC050011, VAR110004); 5. GL: Emergency
Repair – SHOPP Emergency Response [REG070001, VAR110005];
6. GL: Safety Improvements - SHOPP Mandates [VAR991003, VAR110042];
and 7. GL: Pavement Resurfacing and Rehabilitation for the
SHS – Highway Maintenance [REG090058, VAR110031]. Changes
made with this revision do not affect the air quality conformity
or conflict with the financial constraint requirements. |
11-27
Approved |
Administrative Modification |
41 |
$22,600,227 |
10-1-12
|
N/A |
N/A |
| Administrative modification 2011-27 revises
41 projects with a net increase in funding of $22.6 million.
Among other changes, this revision: updates the funding plans
of five CMAQ funded projects to reflect obligations and programming
priorities; updates the funding plan for VTA’s Standard & Small
Bus Replacement project to reflect the award of $7.5 million
in FTA State of Good Repair (SGR) grant funds with a net
increase in project cost of $9.4 million; updates the funding
plans of 17 projects to reflect changes in the Transit Capital
Priorities Program, notably two projects with $10 million
project cost changes – Caltrain’s Positive Train
Control System and SF Muni’s rail Replacement Program – Part
B; programs $1.5M in One Bay Area Grant funds to STA’s
West B. Street Bike/Pedestrian Undercrossing; updates the
funding plan and back-up list of one grouped listing and
splits out the programming for fiscal years 2013 onwards
to form a new listing, per Caltrans’ request - GL Railroad/Highway
Crossings (VAR991009, VAR110046); and updates the funding
plan of five projects to reprogram unobligated earmarks.
The administrative modification is financially constrained
by year. MTC’s 2011 TIP, as revised with Revision No.
2011-27, remains in conformity with the applicable State
Implementation Plan (SIP) for air quality and the revision
does not interfere with the timely implementation of the
Transportation Control Measures contained in the State Implementation
Plan (SIP). |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-26
Approved |
Administrative Modification |
119 |
$54,634,748 |
9-25-12
|
N/A |
N/A |
| Administrative Modification 2011-26 revises
119 projects with a net increase in funding of $54.6 million.
Among other changes, this revision: updates the funding plans
of several projects to reprogram funds from FY 2011-12 to
FY2012-13 or FY 2013-14; updates the funding plan and back-up
lists of some grouped listings and splits out the programming
for fiscal years 2013 onwards to form new listings, per Caltrans’ request,
to reflect California Transportation Commission (CTC) actions
or commission actions for changes in regional programs; updates
the funding plans of Parking Pricing Regional Analysis (REG110029)
and State Route 237 Express Lanes: I-880 to Mathilda Avenue
(SCL110008) to add in Value Pilot Pricing Program (VPPP)
funds in place of existing Other Local funds; and updates
the funding plan of 12 projects to reprogram unobligated
earmarks. The administrative modification is financially
constrained by year and MTC relies on the State’s programming
capacity in the amount of $2.2 million in VPPP funds, $7.2
million in Highway Maintenance funds, $25.8 million in SHOPP
funding, $2.8 million in High Risk Rural Road Funds and $3
million in Other Federal funds. MTC will update the financial
plan to reflect the additional revenues with the next amendment.
The TIP revision entries have been emailed to your staff.
MTC’s 2011 TIP, as revised with Revision No. 2011-26,
remains in conformity with the applicable State Implementation
Plan (SIP) for air quality and the revision does not interfere
with the timely implementation of the Transportation Control
Measures contained in the State Implementation Plan (SIP). |
11-25
Approved |
Amendment |
88 |
$13,486,957 |
5-23-12
|
7-6-12 |
7-10-12 |
| Amendment 11-25 makes revisions to 88 projects
with a net increase in funding of $13.5 million. Among other
changes, the revision: archives 14 projects from the TIP
as they have been completed; deletes eight projects from
the TIP because the funding has been redirected to other
projects; amends four new CMAQ funded Transit Performance
Initiative projects into the TIP (AC Transit: Line 51 Corridor
using $10.5 million; SFMTA: Mission Mobility Maximization
using $7 million; SFMTA: N-Judah Mobility Maximization using
$3.8 million; and VTA: Light Rail Transit Signal Priority
Improvement using $1.6 million;) and updates the funding
plan of the VTA: Stevens Creek Bus Rapid Transit project
to add $712,888 in CMAQ funds from the Transit Performance
Initiative Program; amends in five new transit capital maintenance
projects using FTA 5307 funds; amends three new grouped listings
into the TIP (GL: JARC FY10-FY12 Small UA & Rural; GL:
JARC FY11-FY12 Large UA; and GL: New Freedom FY10-FY12 Small & Rural)
totaling $15.2 million; amends 12 new exempt projects funded
with STIP funds based on the 2012 STIP; amends in two new
exempt projects in San Francisco using $1.4 million in Value
Pricing Program Project (VPPP) funds (Linked Priced Electric
Bikesharing) and San Francisco Value Pricing and Regulation
Study); amends in the San Anselmo - Center Blvd Bridge Replacement
project funded with $5.1 million in Highway Bridge Program
funds; amends in the Caltrain Positive Train Control project
funded with $6.7 million in Proposition 1B funds and $20.8
million in Sales Tax measure and Other Local funds; updates
the funding plan of the Alameda County Safe Routes to School
project to transfer $200,000 in STP funds and $420,000 in
CMAQ funds to the new ACE: Preventive Maintenance project
and adds a new Alameda County SR2S- Local project funded
with $1.2 million in Sales Tax funds; updates the funding
plans and scope for four National Park Service projects to
show full project funding and to expand the projects to all
National Park Service areas; updates the funding plan of
I-280/Route 1 Interchange Safety Improvements project to
reduce scope and cost by $63.8 million; and updates the funding
plan of the Hayward Shop and Yard Expansion project to add
in $75 million in Sales Tax Measure funds and remove $37.9
million in Other Local funds. The revisions made pursuant
to this amendment will not change the air quality conformity
finding or conflict with the financial constraint requirements
of the TIP, therefore a conformity determination is not required
and the 2011 TIP remains financially constrained. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-24
Approved |
Administrative Modification |
86 |
$23,465,163 |
61-12
|
N/A |
N/A |
| TIP Revision No. 2011-24 revises 86 projects
with a net decrease in funding of $23.5 million. Among other
changes, this revision: Updates the funding plans of five
STIP funded projects, two Proposition 1B CMIA funded projects
and one Proposition 1B SLPP funded project to reflect CTC
actions; Updates the Air Quality Descriptions of 10 projects
in concurrence with Air Quality Conformity Task Force actions;
Updates the Sponsor and Implementing Agency information on
27 projects to reflect the consolidation of ACTIA and ACCMA
into ACTC; Updates the funding plans of 13 Regional Planning
Activity projects to reflect the programming of STP funds;
Updates the funding plan of the SF Muni Third Street Light
Rail Phase 2 - New Central Subway project to change the fund
source for $85 million in RTP-LRP funds in FY 2015 to FTA
New Starts funds in FY 2012 and revise $251.3 million in
RTP-LRP funding to Prop-1A ($61.3 million), Prop-1B ($126
million) and local funds ($64 million). The total project
cost for the project does not change; and Updates the funding
plans and back up listings of three grouped listings (GL:
Pavement Resurfacing and Rehabilitation for the SHS – Highway
Maintenance [REG090058]; GL: FY10 JARC Mobility Management
[REG110028]; and GL: Safety Improvements – SHOPP Mobility
Program [MTC050006] including splitting out six projects
along with $42.8 million to REG090003). The administrative
modification is financially constrained by year and MTC relies
on the State’s programming capacity in the amount of
$85 million in 5309 funds, $9.5 million in SHOPP funding,
$282,000 in federal High Priority Project funding, and $58.2
million in Proposition 1B funding. MTC will update the financial
plan to reflect the additional revenues with the next amendment.
MTC’s 2011 TIP, as revised with Revision No. 2011-24,
remains in conformity with the applicable State Implementation
Plan (SIP) for air quality and the revision does not interfere
with the timely implementation of the Transportation Control
Measures contained in the State Implementation Plan (SIP). |
11-23
Approved |
Administrative Modification |
51 |
$26,007,662 |
5-1-12
|
N/A |
N/A |
| TIP Revision No. 2011-23 revises 51 projects
with a net increase in funding of $26 million. Among other
changes, this revision: updates the funding plans of 14 projects
to reflect 2012 STIP requests; updates the funding plans
and project information on six individually listed projects
funded through the Highway Bridge Program including splitting
out eight project elements and $33 million from the Highway
Bridge Program grouped listing (VAR991007) to the individually
listed Yerba Buena Island (YBI) Ramp Improvements project
(SF-070027); updates the funding plan and back-up listing
of five Caltrans managed grouped listings to reflect the
latest information from Caltrans (GL: Bridge Rehabilitation/
Reconstruction - Highway Bridge Program [VAR991007]; GL:
Pavement Resurfacing/Rehabilitation – SHOPP roadway
Preservation [MTC050009]; GL: Safety Improvements – SHOPP
Collision Reduction [MTC050011]; GL: Emergency Repair – SHOPP
Emergency Response [REG070001]; and GL: Bridge Rehab and
Reconstruction – SHOPP [VAR991005]) to reflect the
latest information from Caltrans; and updates the funding
plans of three Proposition 1B CMIA funded projects to reflect
the latest CTC actions. The administrative modification is
financially constrained by year and MTC relies on the State’s
programming capacity in the amount of $9.5 million in SHOPP
funding, $282,000 in federal High Priority Project funding,
$43.6 million in Proposition 1B funding. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-22
Approved |
Amendment |
100 |
$157,073,127 |
3-28-12
|
4-17-12 |
5-1-12 |
| Amendment 11-22 makes revisions to 100 projects
with a net increase in funding of $157 million. Among other
changes, the revision: archives 52 projects from the TIP
as they have been completed; deletes four projects from the
TIP: two duplicate projects and two projects because the
funding has been redirected to other projects; amends seven
new exempt projects into the TIP (AC Transit: Procure (23)
60' Articulated Buses using $16.6 million in Proposition
1B funds; AC Transit: Procure (37) 40' Urban Transit Buses
using $13.6 million in Proposition 1B funds; AC Transit:
Procure (30) 40' Suburban Buses using $11.3 million in Proposition
1B funds; LAVTA - East Bay Radio Communication System Hookup
using $512,000 in FTA 5307 funds; Capital Improvements for
Muir Woods Shuttle using $1.1 million in FTA 5320 funds;
Parking Pricing Regional Analysis with $700,000 in Local
funds and Stewarts Point Rancheria EV Pilot Program with
$367,000 in regional exchange funds); amends one new grouped
listing into the TIP (GL: FY10 Mobility Management & Job
Access [REG110028]) with 846,000 in Other Local funds; updates
the funding plan of the Freeway Performance Initiative to
add in $66 million in Other Local funds; updates the funding
plan of the Incident Management Program to add in $17.9 million
in Other Local funds; updates the funding plan and back-up
listing of the Caltrans Managed Grouped Listings for Highway
Maintenance (REG090058) to add $12.3 million; and updates
the funding plans of 12 regional planning activities projects
to add in $37.4 million in Other Local funds and $7.6 million
in STIP funds. The revisions made pursuant to this amendment
will not change the air quality conformity finding or conflict
with the financial constraint requirements of the TIP, therefore
a conformity determination is not required and the 2011 TIP
remains financially constrained. |
11-21
Approved |
Administrative Modification |
43 |
$21,307,891 |
3-15-12
|
N/A |
N/A |
| TIP Revision No. 2011-21 revises 43 projects with a net increase in funding of $21.3 million. Among other changes, this revision: adds $17.5 million in Proposition 1B – PTMISEA funds to the BART Train Control Renovation project (BRT030004) as part of a funding agreement between BART, SFMTA, and AC Transit and transfers $8 million in FTA Section 5309 Fixed Guideway funds and $2 million in local matching funds to two projects (BART: Traction Power System Renovation [BRT030005] and BART: Rail, Way and Structure Program [BRT97100B]); splits out a majority of the Contra Costa County sponsored SR239 Construction project (CC-070019) to the Contra Costa Transportation Authority sponsored SR239 – New State Highway project (CC-110066) with the original listing retaining only the planning study; splits out the streetscape, repaving, and bike lane elements along with $5.3 million in local funds from SFMTA’s Second Street Streetscape project (SF-110008) to the new Second Street Streetscape Phase 2 – Streetscape project (SF-110033); updates the funding plan of the US 101 Doyle Drive Replacement project (SF-991030) to add $10 million in local funds; transfers funds and project segments among three of Solano Transportation Authority’s Jepson Parkway projects (SOL110003, SOL110005, and SOL110006) without changing the overall scope or funding amounts of the combined projects; updates the funding plans of nine projects to identify committed fund sources in place of other local funds; and updates the back-up listings for two grouped listings: SHOPP Mobility Program (MTC050006) and SHOPP Minor Program (REG090072) and updates the funding plan for the SHOPP Minor listing. The administrative modification is financially constrained by year and MTC relies on the State’s programming capacity in the amount of $3.6 million in FTA Section 5309 Discretionary funding, $3.3 million in federal High Priority Project funding, and $17.5 million in Proposition 1B PTMISEA funding. MTC’s 2011 TIP, as revised with Revision No. 2011-21, remains in conformity with the applicable State Implementation Plan (SIP) for air quality and the revision does not interfere with the timely implementation of the Transportation Control Measures contained in the State Implementation Plan (SIP). |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-20
Approved |
Administrative Modification |
3 |
$80, 480 |
3-6-12
|
N/A |
N/A |
| TIP Revision No. 2011-20 revises three projects
with a net decrease in funding of $80,480. The revision updates
the scope and funding plan of the BART - Warm Springs to
Berryessa Extension to reprogram $100 million in FTA 5309
New Starts funds from FY2015 to FY2012; splits out Union
Pacific Railroad (UPRR) structure replacement and UPRR realignment
elements along with $43.8 million in Local funds to the newly
created Mission, Warren, Freight Rail Relocation project;
and updates the scope and funding plan of the Caltrans sponsored
I-880/SR 262 Interchange and HOV lanes project to split out
the widening of Mission Boulevard and the Warren Avenue grade
separation along with $43.3 million in local funds and $4.2
million in FY2012 Earmark funds to the newly created Mission,
Warren, Freight Rail Relocation project. The administrative
modification is financially constrained by year and MTC relies
on the State’s programming capacity in the amount of
$100 million for FTA 5309 New Starts funds programmed through
this administrative modification. MTC’s 2011 TIP, as
revised with Revision No. 2011-20, remains in conformity
with the applicable State Implementation Plan (SIP) for air
quality and the revision does not interfere with the timely
implementation of the Transportation Control Measures contained
in the State Implementation Plan (SIP). |
11-19
Approved |
Amendment |
67 |
$166,189,272 |
1-25-12
|
2-9-12 |
3-2-12 |
| Amendment 11-19 revises 67 projects with a
net increase in funding of $166.2 million. Among other changes,
the revision: updates the funding plans of three transit
projects and adds six new exempt transit projects into the
TIP with $12 million in FTA State of Good Repair funds and
$3.5 million in FTA Bus Livability funds; archives 35 projects
as they have been completed; updates the funding plans and
back-up listings of two Caltrans Managed Grouped Listings:
SHOPP Emergency Response [REG070001] to add $71.7 million
and SHOPP Bridge Rehabilitation and Reconstruction [VAR991005]
to add $15.9 million; deletes two projects from the TIP:
East Leland Park and Ride Lot [CC-070061] and Caltrans: I-280
/ I-380 Interchange Local Access Improvements [SM-991118];
amends four new exempt transit projects into the TIP funded
with a total of $695,171 in FY11-2012 FTA 5307 funds and
one new exempt bike project funded with $649,000 in RIP-TE
funds; updates the funding plan of 511 Traveler Information
to add in $41.6 million in Other Local funds; and updates
the funding plan of the AC Transit: Preventive Maintenance
Program to add in $10 million in FTA 5307 funds. Changes
made with this revision do not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-18
Approved |
Administrative Modification |
20 |
$15,893,096 |
2-2-12
|
N/A |
N/A |
| TIP Revision No. 2011-18 revises 20 projects
with a net increase in funding of $15.9 million. Among other
changes, this revision: updates the funding plans and back-up
listings of the Pavement Resurfacing/ Rehabilitation on the
State Highway System – Highway Maintenance (REG090058),
the US 206 Recreational Trail Grants Program (REG070014),
and the FTA 5311 Non-Urbanized Formula Program (VAR030002)
to reflect new programming; updates the back-up listing of
the JARC FY09-FY10 Large Urbanized Area to reprogram funds
between projects with no change in the cost of the overall
grouped listing; revises the fund source for $12.4 million
in Other Local funds to State-STP for the San Jose: Road
Rehabilitation and Pedestrian Facilities project (SCL110107);
reprograms $2.9 million in RIP funds between phases and program
years for the Marin County portion of the US 101 HOV Lanes – Marin-Sonoma
Narrows project; and transfers $1.7 million in FTA 5309 Fixed
Guideway and local matching funds from Caltrain’s Systemwide
Track Rehab and Related Structures project (SM-03006B) to
Caltrain’s Signal/Communication Rehabilitation and
Upgrades project (SM-050041). The administrative modification
is financially constrained by year and MTC relies on the
State’s programming capacity in the amount of $345,000
for US 206 Recreational Trails Grant funding and $22.5 million
for State STP funding. |
11-17
Approved |
Administrative Modification |
17 |
$16,742,356 |
1-9-12
|
N/A |
N/A |
| TIP Revision No. 2011-17 revises 17 projects
with a net increase in funding of $16.7 million. Among other
changes, this revision: updates the funding plans of six
FTA funded projects to program $3.5 million in 5307 funds,
$4.1 million in 5309 State of Good Repair funds, and $1.2
million in 5339 Alternatives Analysis funds; updates the
funding plans and back-up listings of two Caltrans managed
grouped listings (SHOPP Mobility Program [MTC050006] and
SHOPP Collision Reduction [MTC050011]); updates the back-up
listings of two grouped listings (ARRA – FTA 5311 [REG090010]
and FTA Non-Urbanized Formula Program [VAR030002]) to reflect
the consolidation of Vallejo Transit and Benicia Breeze to
form Solano County Transit (SolTrans) with no change in the
cost of the individual projects or the overall grouped listings;
and clarifies the project description of the eFleet: Carsharing
Electrified project (REG110012) to include the installation
of chargers. The administrative modification is financially
constrained by year and MTC relies on the State’s programming
capacity in the amount of $5.4 million for SHOPP funding
and $1.2 million in FTA 5339 Alternative Analysis funds programmed
through this administrative modification. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-16
Approved |
Amendment |
69 |
$281,492,346 |
11-16-11
|
11-30-11 |
12-7-11 |
| Amendment 11-16 makes revisions to 69 projects
with a net increase in funding of $281.5 million. Among other
changes, the revision: updates the funding plan of the TIP to
add approximately $24.5 million in FTA discretionary Grant Revenues;
updates the funding plans of 14 projects and adds 17 new exempt
projects into the TIP with a $161 million total increase in FTA
programming to reflect changes to the Transit Capital Priorities
Program; archives 10 projects as they have been completed; transfers
$600,000 in CMAQ funds to Santa Rosa City Bus’s Automated
Vehicle Location System (SON090007) from the Green My Ride TDM
Program (SON110005) and deletes the project as it will not be
going forward; amends four new exempt projects into the TIP (Santa
Clara County: Isabel Bridge Replacement [SCL110108] using $4.5
million in HBP funds; San Rafael: Sidewalk along East Francisco
Blvd [MRN110029] using $1.5 million in NMTPP funds; San Jose:
Road Rehab and Pedestrian Facilities [SCL110107] using $15 million
in local funds; and Environmental Study for ACE Alignment [ALA110086]
using $300,000 in HSR 1103(f) funds); amends one new grouped
listings into the TIP (New Freedom FY10 & FY11 Large UA [REG110026]);
splits FY2009 5310 and local funds from the Elderly & Persons
with Disability Program (VAR030001) to create a new listing Elderly & Persons
with Disability Program (REG110027), adds $5.2 million in FY2011
5310 funds to the new listing, and archives the previous listing;
updates the funding plans and back-up listings of two Caltrans
Managed Grouped Listings (the Safe Routes to School Program [REG090001]
to add $11.8 million and the Highway Bridge Program (VAR991007)
to add $45.6 million; and updates the funding plans of five individually-listed
projects funded with Highway Bridge Program funds (including
deleting the individually listed Doherty Drive Bridge Replacement
Project [MRN110001] to combine it with the Highway Bridge Program
Grouped Listing). |
11-15
Approved |
Administrative Modification |
81 |
$112,649,681 |
11-21-11
|
N/A |
N/A |
| TIP Revision No. 2011-15 revises 81 projects with
a net increase in funding of $112.7 million. Among other changes,
this revision: updates the funding plans of 40 projects to reflect
changes to the Transit Capital Priorities Program, programming
$99.6 million in FTA Section 5307 funds and $45.3 million in
FTA Section 5309 Fixed-Guideway funds; updates the funding plans
of 9 individually listed projects funded through Caltrans’ Highway
Bridge Program; updates the funding plans and back up listings
of four grouped listings (SHOPP Collision Reduction [MTC050011],
SHOPP Emergency Response [REG070001], SHOPP Mandates [VAR991003],
and FTA Non-Urbanized Formula Program [VAR030002]); updates the
project sponsor and implementing agency for ten Benicia Breeze
and seven Vallejo Transit projects to reflect the consolidation
of these two agencies to form Solano County Transit (Soltrans);
transfers $500,000 in CMAQ funds from the Moraga Way Streetscape
Improvements project (CC-110055) to the Richmond – Nevin
Ave. Bicycle and Pedestrian Improvements and Streetscape project
(CC-110007); and updates the funding plan to the Sonoma County
portion of the US 101 Marin/Sonoma Narrows project to reflect
the programming of $45 million in Proposition 1B – CMIA
funds, $1.9 million in Proposition 1B – SLPP funds and
$8.7 million in local sales tax funds. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-14
Approved |
Administrative Modification |
33 |
$5,740,765 |
10-4-11
|
N/A |
N/A |
| TIP Revision No. 2011-14 revises 33 projects with
a net increase in funding of $5.7 million. Among other changes,
this revision: updates the funding plans of 17 STP/CMAQ funded
projects to reconcile with actual obligations and updated project
schedules; revises the Air Quality Conformity Exemption descriptions
of 9 projects in concurrence with Air Quality Conformity Task
Force item 3d on September 22, 2011, 1 project in concurrence
with Task Force item 1b on August 25, 2011 and 1 project in concurrence
with Task Force item 2b on March 7, 2011; updates the funding
plans of four Non-Motorized Transportation Pilot Program funded
projects to reflect actual costs; and updates the funding plan
and back-up listing of the FTA Non-Urbanized Formula Program
grouped listing (VAR030002) to add $68,812 in FTA 5311(f) funds
and $56,361 in local funds. The administrative modification is
financially constrained by year and MTC relies on the State’s
federal programming capacity in the amount of $670,000 for Earmark
and FTA 5311(f) funds programmed through this administrative
modification. MTC’s 2011 TIP, as revised with Revision
No. 2011-14, remains in conformity with the applicable State
Implementation Plan (SIP) for air quality and the revision does
not interfere with the timely implementation of the Transportation
Control Measures contained in the State Implementation Plan (SIP). |
11-13
Approved |
Amendment |
15 |
$68,305,699 |
9-28-11
|
10-19-11 |
11-10-11 |
| Amendment 2011-13 makes revisions to 15 projects
with a net increase in funding of $68.4 million. Among other
changes, the revision: updates the funding plan of the TIP to
add approximately $13.5 million in federal discretionary revenues;
updates the funding plans and back-up listings of three Caltrans
managed Grouped Listings (Safety Improvements Highway Safety
Improvement Program [REG070009] - splits out $900,000 in HSIP
funds to the individually listed Highway 9 Safety Improvements
project [SCL070050], Emergency Repair SHOPP Emergency Response
[REG070001] - updates the back-up list and adds in $29.2 million
in programming, and Bridge Rehabilitation and Reconstruction
SHOPP [REG110025] - updates the back-up list and adds in $11.6
million in programming); programs $3 million in federal discretionary
funds to amend in two new projects (Caltrain Transit Asset Management
System [REG110025] and San Pablo Bay NWR Access Road in Petaluma
[SON110030]) and updates the funding plan of the Napa Valley
Vine Trail Design and Construction project (NAP110014); amends
in one new project using $500,000 in CMAQ - TLC funds (Moraga
Way Streetscape Improvements [CC-110055]) and updates the scopes
and funding plans of two other CMAQ funded projects (South Hayward
BART Area/Dixon Street Streetscape [ALA110035] and Local Government
EV Fleet Program [REG110013]); and archives the Sunnyvale/Evelyn
Avenue/Maria Lane Overlay project from the TIP as the project
has been completed and is open to traffic. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-12
Approved |
Administrative Modification |
22 |
$2,794,611 |
9-1-11
|
N/A |
N/A |
| Revision 11-12 is an administrative modification
that revises 22 projects with a net increase in funding of $2.8
million. Among other changes, this revision: programs $10.5 million
in federal discretionary funding to update the funding plans
of five projects (Napa Valley Vine Trail – Design Segments
[NAP110014], I-680 Auxiliary Lanes [CC-030005], SR 82 – El
Camino Real Grand Boulevard Initiative [SM-050051], GGBHTD – Replacement
of Ferry Propulsion Systems [MRN090025], and Ferry Service – Berkeley/Albany
[MTC050027]); updates the funding plans of all Non-Motorized
Transportation Pilot Programs (NMTPP) funded projects in the
TIP to reflect actual obligations and removes $2.6 million from
the NMTPP for Marin County listing (MRN050033) as these funds
are already included in the individual listing for the Cal-Park
Hill Tunnel project (MRN030003); and shifts the second phase
of the Walnut Creek - Ygnacio Valley Road Ped/Bike Trail project
(CC-050031) to a new individually listed project (CC-110054).
The administrative modification is financially constrained and
MTC relies on the State’s federal programming capacity
in the amount of $10.5 million for federal discretionary funds
programmed through this administrative modification. Changes
made with this revision do not affect the air quality conformity. |
11-11
Approved |
Administrative Modification |
15 |
$650,402 |
8-4-11
|
8-8-11 |
N/A |
| TIP Revision No. 11-11 revises 15 projects with a net increase in funding of $650,402. Among other changes, this revision: Updates the funding plan of the Non-Motorized Transportation Pilot Program (NMTPP) for Marin County to add in $398,902 in NMTPP earmark funds; Updates the air quality exemption codes for seven projects to reflect the project descriptions as approved by the Air Quality Conformity Task Force on July 28, 2011; and Updates grouped listings for the Jobs Access and Reverse Commute (JARC) Small Urbanized Area and Rural Area Program to add $400,000 in JARC funds and reduce Other Local funds by $148,500, and to include a new back-up list. Changes made with this revision do not affect the air quality conformity. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-10
Approved |
Amendment |
34 |
$51,992,806 |
7-27-11
|
9-8-11
|
9-15-11 |
| Amendment 2011-10 makes revisions to 34 projects
with a net increase in funding of $52 million. Among other
changes, the revision: updates the funding plan and schedule
for the San Jose International Airport People Mover (SCL090019)
to remove $50.4 million in RTIP funding and $402 million
in Santa Clara County Sales Tax Measure funds and moves the
project to later years; updates the funding plan for the
BART to Silicon Valley - Warm Springs to Berryessa extension
(SCL110005) to replace $50.4 million in Santa Clara Sales
Tax Measure funds with $50.4 million in RTIP funding redirected
from the San Jose People Mover (SCL090019) by the California
Transportation Commission (CTC); updates the funding plans
of SFMTA’s Third St. LRT Phase 2 – New Central
Subway and AC Transit’s Enhanced Bus – Telegraph/International/East
14th Street to program $35 million in FY11 5309 New Starts
and Small Starts funding in place of existing long range
plan funds with no change to the total project cost; updates
the funding plans of the SF Ferry Terminal/Berthing Facilities
project (MTC050029) to add $16 million in Proposition 1B
funds; adds approximately $16 million in local funds to the
US 101/Broadway Interchange Reconstruction project (SM-050028);
amends 11 new exempt projects into the TIP using $3.9 million
in STP funding, $2.6 million in IIP funding, $2.5 million
in CMAQ funding, $117,000 in HPP earmark funding, $1.2 million
in local funding, and $52,000 in FEMA funding; adds four
projects in Contra Costa County using MTC’s Safe Routes
to School CMAQ funds; updates two Caltrans managed Group
Listings: SRTS Safety Improvements and SHOPP Pavement Resurfacing;
and deletes the Travis AFB: North Gate Improvements project
(SOL070048) because the funds were redirected to other projects. |
11-09
Approved |
Amendment |
0 |
$0 |
7-27-11
|
8-17-11
|
N/A |
| Amendment 11-09 does not make any changes to
project listings in the TIP. The amendment makes the following
changes: Expands the delegated signatory authority of the
Executive Director and Deputy Directors for approving TIP
administrative modifications to include approval of administrative
modifications to the Federal Statewide Transportation Improvement
Program (FSTIP); Updates reference to the latest Public Participation
Plan approved by MTC on December 15, 2011(Appendix A-4 of
the adopted 2011 TIP). Revises the 2011 TIP revision process
and procedures (Appendix A-33 of the adopted 2011 TIP) to
include provisions of the updated public participation plan
and incorporate the FSTIP/TIP administrative modifications
and Amendment procedures recently revised by FHWA and FTA,
including the following changes - Revises the amount a project
may be changed as an administrative modification from the
current threshold of the lesser of 25% or $5 million, to
the lesser of 40% or $10 million; Allows the programming
of the Preliminary Engineering (PE) phase as an administrative
modification if right of Way or Construction is already programmed
in the TIP; Allows the reprogramming of an FTA funded project
from the Prior TIP into the current TIP as an administrative
modification; Allows the addition or deletion of a project
from a grouped project listing provided the funding amounts
are within the threshold of the lesser of 40% or $10 million;
and Allows the description of a project in a grouped project
listing to be changed as an administrative modification as
long as such change does not conflict with the approved environmental
document. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-08
Approved |
Admin. Mod. |
55 |
$13,581,159 |
7-7-11
|
7-8-11
|
N/A |
TIP revision 11-08 revises 55 projects with
a net increase in funding of $13.6 million. Among other changes,
this revision: updates the funding plans of 12 STIP funded
projects to reflect the latest approvals by CTC; updates
the funding plans for 10 projects with no change in the total
cost by changing fund sources (eg. BART – Berryessa
to San Jose Extension - Fund source change in years outside
of the four years of the TIP) or reprograms funds between
phases (e.g. $3.7 million in Public Lands Highway funds from
the construction phase to right-of-way for the US 101 Doyle
Drive Replacement project) or changes the funding between
years (e.g. reprograms $15 million in 5309 Small Starts funds
from FY12 to FY11 for the Van Ness Bus Rapid Transit project);
updates the air quality exemption codes for 14 projects to
reflect the project descriptions; splits a portion of the
SR1-19th Avenue Streetscape Improvements (SF-070025) project
to create a locally funded project; and updates four Caltrans
managed grouped listings: High Risk Rural Roads, Highway
Safety Improvement Program, SHOPP Mobility program, and SHOPP
Collision Reduction program.
MTC relies on the State’s
federal programming capacity in the amount of $668,000 for
the Earmark funding programmed through this administrative
modification. Changes made with this revision do not affect
the air quality conformity. |
11-07
Approved |
Amendment |
39 |
$2,628,538 |
6-22-11
|
7-25-11
|
8-9-11 |
| Amendment 11-07 makes revisions to 39 projects
with a net increase in funding of $2.6 million. Among other
changes, the revision: transfers $7.3 million in FY2010-11
FTA 5307 funds and $1.8 million in local matching funds from
the BART Car Exchange (Preventive Maintenance) (REG050020)
to BART’s Railcar Replacement Program (REG090037);
updates the funding plans of three projects (transfers $17.5
million in FY 2008-09 CMAQ funding from the AC Transit’s
Enhanced Bus – Telegraph/ International/ East 14th
project [ALA050017] to the SF Muni Third Street LRT Phase
2 – New Central Subway project [SF-010037], reduces
the FY 2010-11 Proposition 1B – PTMISEA funds on the
SF Muni Third St. LRT Phase 2 – New Central Subway
project [SF-010037] by $17.5 million, and adds $14.5 million
in FTA 5307 funds and $3.6 million in local matching funds
to AC Transit’s Preventive Maintenance Program [ALA991070]);
updates the funding plan for WETA’s Central Bay Operations
and Maintenance Facility (ALA110001) to reflect the transfer
of $2.5 million in FTA 5309 funds from the Ferry Service – Berkeley/Albany
project (MTC050027) and increase the total cost of the facility
project by $6.6 million; reduces the FY2010-11 FTA 5307 funds
on SFMTA- Motor coach replacement- 45 NABI buses (SF-090043)
by $16 million and transfers the remaining $4 million in
FTA 5307 funds to SF Muni Rail Replacement Program Part B
(SF-95037B); and increases the amount of FTA 5309 Fixed Guideway
funds on two projects by $3.3 million each (VTA: Rail Substation
Rehab/Replacement [SCL050049] and TP OCS Rehab & Replacement
[SCL090044]). Changes made with this revision do not affect
the air quality conformity or conflict with the financial
constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-06
Approved |
Amendment |
42 |
$88,510,134 |
5-25-11
|
6-27-11
|
7-13-11 |
| TIP Amendment 11-06 makes revisions to 42 projects
with a net decrease in funding of $88.5 million. Among other
changes, the revision: amends in five new exempt projects
(Kirker Pass Road Overlay [CC-110044] and Napa County Road
Rehabilitation -Various Streets funded with $2.7 million
in STP funds [NAP110019]; SR92/El Camino Real (SR82) Ramp
Modifications Project [SM-110047] funded with $2.8 million
in federal earmark funding and Lake Merritt Improvement Project
[ALA110072] funded with $827,900 in federal earmark funding;
and San Jose Walk N Roll – Safe Access [SCL110057]
project funded with $568,000 in CMAQ funding); updates the
back-up lists and revises the costs for three Caltrans managed
Grouped Listings (Highway Bridge Program for Local Bridges
[VAR991007] is reduced by $241.5 million; the revision also
splits out 18 projects totaling $93.9 million from the Highway
Bridge Program Grouped Listing and archives them as the funds
have been obligated and the projects delivered; Safety Improvements – Highway
Safety Improvement Program [REG070009] is increased by $22.4
million; SHOPP – Emergency Response [REG070001] is
increased by $12.4 million; and Railroad/Highway Crossings
[VAR991009] is increased by $2.3 million); and updates the
funding plan for the I-80 Integrated Corridor Mobility Project
(ALA070041) to add $8.1 million in Other Local funds and
reprogram $76.7 million in Proposition 1B funds from prior
years to FY2011 ($31.4 million) and FY2012 ($45.3 million).
Changes made with this revision do not affect the air quality
conformity or conflict with the financial constraint requirements.
The Highway Safety Improvement Program grouped listing (REG070009)
has been updated. |
11-05
Approved |
Amendment |
127 |
$218,866,417 |
3-23-11
|
3-25-11
|
3-30-11 |
| Amendment 11-05 revises 127 projects with a
net increase in funding of $218.9 million. Among other changes,
the revision: Amends in five new exempt projects into the
TIP for approximately $3.9 million– that were originally
listed under the County Safe Routes to School (SRTS) Grouped
Listing REG090071. The grouped listing is being deleted as
part of this amendment; Amend in a new exempt project funded
with TIGER II funds of approximately $2 million: Oakland
Army Base Infrastructure Master Plan (ALA110046); Update
the name, scope and the cost of Iron Horse Trail, Tri-Valley
Transit Connector to East Bay Green Transportation Initiative
(ALA110011) and add in $7.9 million in TIGER II funds and
$7 million in Other Local funds; Updates the back-up lists
and increases the costs for the following Caltrans managed
Grouped Listings: SHOPP - Roadway Preservation (MTC050009)
by $82.8 million; SHOPP - Collision Reduction (MTC050011)
by $73.9 million; SHOPP - Emergency Response (REG070001)
by $15.8 million; SHOPP - Mandates (VAR991003) by $22.9 million;
SHOPP - Bridge Rehab and Reconstruction (VAR991005) by $29.4
million; Highway Bridge Program for Local Bridges (VAR991007)
by $159.8 million; Deletes four duplicate projects from the
TIP: Port of Oakland 7th Street Grade Separation (ALA070023
- $180.2 million); City of Napa - Freeway Drive/Golden Gate
CIR Project. (NAP090015 - $793,000); Freeway Drive/Golden
Gate Drive Pavement Rehab (NAP11005 - $793,000) and Sunnyvale
Ave/Old San Francisco Rd Intersection (SCL110011 - $835,
000). Changes made with this revision do not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-04
Approved |
Admin. Mod. |
22 |
$1,673,655 |
5-2-11
|
5-2-11
|
N/A |
| TIP revision 11-04 revises 22 projects with
a net increase in funding of $1.67 million. Among other changes,
this revision: updates the funding plan of the Almaden Expressway
Improvements project (SCL070005) to add $2.6 million in FY2010-11
CON Earmark-T3-HPP funds with 20% toll credit match and reduce
FY2007-08 CON Other Local funds by $1.2 million; transfers
$250,000 in Non-motorized Transportation Pilot Program (NMTPP)
funds from Marin County’s NMTPP (MRN050033) to the
City of Novato’s NMTPP (MRN070011); and updates the
funding plan of 14 projects to reprogram funds between phases,
fund sources and years, with minor changes to project cost
in ten cases. The significant cost change was the reduction
of the total cost of the Regional Bicycle Sharing Pilot project
(REG110010) by $431,350. Changes made with this revision
do not affect the air quality conformity or conflict with
the financial constraint requirements. |
11-03
Approved |
Amendment |
47 |
$38,046,007 |
12-15-10
|
12-29-10
|
12-30-10 |
| TIP Revision 11-03 makes revisions to 47 projects
with a net increase in funding of $38 million. Among these
changes, the revision: amends in 17 new exempt Climate Initiative
Program projects into the TIP – 13 of which fall under
the Innovative Grants Category and 4 under the Safe Route
to Schools Creative Grants Category; removes 5 Climate Initiative
Program projects from the TIP based on finalization of the
program; amends in five new exempt projects funded with FTA
State of Good Repair Funds of approximately $16.9 million;
updates the funding plan of two projects to add State of
Good Repair Funds of $36.9 million (SFMTA: Islais Creek Motor
Coach Facility (SF990004) and NCTPA: Replace Rolling Stock
(NAP090005)); amends the funding plan of AC Transit’s
Zero Emission Bus Advanced Demonstration project (ALA070046)
to add in $6 million in TIGGER II funding and $2 million
in matching funds; amends in two new exempt projects funded
with TIGER II funds of approximately $3.3 million (Iron Horse
Trail, Tri-Valley Transit Connector (ALA110011) and Grand
Boulevard Initiative: Removing Barriers to Livable Communities
(SM-110006)); and updates the funding plan of the US 101
Doyle Drive Replacement project (SF-991030) to reflect changes
made as part of Revision 2009-59 and to reconcile federal
funding to match final obligations. Changes made with this
revision do not affect the air quality conformity or conflict
with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
11-02
Approved |
Admin Mod. |
35 |
$981,383 |
2-17-11
|
2-18-11
|
N/A |
| TIP revision 11-02 revises 35 projects with
a net increase in funding of $981,383. Among other changes,
this revision: Updates the funding plan of the Non-motorized
Transp. Projects – Marin County project (MRN090049)
to add approx. $1 million in NMTPP funds in FY11; Updates
the Caltrans managed Grouped Listing for Collision Reduction
(MTC050011) to update the back-up list and add $610,999;
and Updates the STP /CMAQ funded grouped listing for the
County Safe Routes to School (SRTS) Program (REG090071) to
update the back-up list and reduce the cost by $622,000.
Changes made with this revision do not affect the air quality
conformity or conflict with the financial constraint requirements. |
11-01
Approved |
Admin Mod. |
198 |
$13,459,348 |
1-4-11
|
1-6-11
|
N/A |
| TIP revision 11-01 revises 198 projects with
a net decrease in funding of $13.5 million. Among other changes,
this revision: splits five STP /CMAQ funded grouped listings:
County Safe Routes to School (SRTS) Program (REG090071),
Transportation Enhancements – Regional Transportation
for Livable Communities (TLC) (REG090073), Pavement Resurfacing/Rehab
- Local Roads System (REG110002), Regional Bike/Ped Projects
(REG110003), and Transportation Enhancements – County
TLC (REG110005) into 117 individual projects to allow for
better tracking of the projects and reconciles project costs
to actual funding in the case of existing projects; the grouped
listing for County SRTS Program (REG090071) continues to
be active in the TIP; all other grouped listings listed above
are being archived; reconciles ARRA funding on 25 projects
to match final obligation amounts; and updates 29 projects
to reflect Caltrans’ use of toll credits for all RIP-TE
funds in FY11. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |