2009 TIP Revisions
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-60
Proposed |
Amendment |
11 |
$18,723,852 |
10-27-10
Letter
|
11-23-10
Letter
|
Pending |
| TIP revision 09-60 archives 11 completed projects
from the TIP – 6 local streets and roads projects and
5 transit projects, with a net decrease in funding of approximately
$18.7 million. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
09-59
Approved |
Admin Mod. |
1 |
$3,200,000 |
10-14-10
Letter
|
10-14-10
Letter
|
N/A |
| TIP revision 09-59 revises revises one project
with a net increase in funding of $3.2 million. This revision
updates the funding plan for the US 101 Doyle Drive project
to reflect the replacement of ARRA-SHOPP funds with AC-STATE-SHOPP
funds and adds $3.7 million in FLHP earmark funds. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-58
Approved |
Admin Mod. |
7 |
$500,000 |
9-22-10
Letter
|
9-23-10
Letter |
N/A |
| TIP revision 09-58 revises seven projects with
a net increase in funding of $500,000. Among these changes,
the funding plans of three projects: I-880 North, Safety
Improvements project (ALA050019); East-West Connector in
Fremont and Union City (ALA978004) and BART Oakland Airport
Connector (BRT990002) were updated to reflect the CTC action
taken on September 22, 2010. The revision also updates the
funding plan of the regional planning project to add in $300,000
in federal planning funds and $300,000 in local matching
funds. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
09-57
Approved |
Admin Mod. |
1 |
$0 |
9-9-10
Letter
|
9-9-10
Letter |
N/A |
| TIP revision 09-57 updates the funding plan
of the Freeway Performance Initiative Project (REG090003)
to change the fund source of $20 million in Other Local funds
programmed in the CON phase to $20 million in CMAQ funds
in the PE phase. There is no net change in funding. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-56
Approved |
Amendment |
236 |
$190,278,006 |
9-22-10
Letter
|
10-15-10
Letter
|
10-17-10
Letter
|
| Revision 09-56 is an amendment that revises
236 projects with a net decrease in funding of approximately
$190.3 million. Among these changes, the amendment: Adds
two AC Transit projects back into the TIP (ALA070047 and
ALA070055) to allow the obligation of funds; Deletes two
duplicate projects from the TIP: Carlson Blvd Improvements,
Tehama to San Jose (CC-090006) and the SR 12/29/221 Intersection
Improvements (NAP010001); Deletes eight projects (CC-070060,
CC-070097, NAP050008, SF-010023, SF-070015, SF-070041, SOL990019
and SOL990021), because the funding originally programmed
had been redirected and deletes three grouped listings (REG090061,
REG090062, REG090063) that were originally programmed when
the Jobs Bill was anticipated; and Archives 230 completed
projects from the TIP – 134 local streets and roads
projects; 14 highway project; 4 toll bridge projects and
77 transit projects. The changes made with this revision
will not affect the air quality conformity or conflict with
the financial constraint requirements. |
09-55
Approved |
Admin Mod. |
5 |
$744,523 |
8-30-10
Letter
|
8-31-10
Letter
|
N/A |
| TIP revision 09-55 revises five projects
with a net increase in funding of $744,523. Among these changes,
the funding plans of three projects were updated to add in
ARRA cost savings. The changes made with this revision will
not affect the air quality conformity or conflict with the
financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-54
Approved |
Amendment |
111 |
$101,563,375 |
7-28-10
Letter
|
8-18-10
Letter
|
9-1-10
Letter |
| Revision 09-54 revises 111 projects with a
net increase in funding of approximately $101.6 million.
Among these changes, the amendment: Programs $15 million
in federal STP and CMAQ funds; Adds a new grouped listing
for Transportation Enhancements projects funded under the
regional Transportation for Livable Communities program with
$43 million in CMAQ funds and $11.7 million in Other Local
funds; Adds $10.8 million in ISTEA earmarks to the Sonoma
Marin Area Rail Transit (SMART) Extension to Larkspur project
(SON070025); Deletes the San Rafael: Street Resurfacing Program – SLPP
(MRN090015) because the funds were redirected to other projects;
and Archives 98 completed projects from the TIP – seventy
five local streets and roads projects; four highway project;
two regional project and seventeen transit projects. The
changes made with this revision will not affect the air quality
conformity or conflict with the financial constraint requirements. |
09-53
Approved |
Admin Mod. |
46 |
$2,131,055 |
8-6-10
Letter
|
8-10-10
Letter |
N/A |
| TIP revision 09-53 revises 46 projects including
three grouped listings with a net decrease in funding of
$2.1 million. Among these changes, the amendment splits three
American Recovery and Reinvestment Act (ARRA) grouped listings
into 39 individual projects to allow for better tracking
of the projects, and reconciles project costs to actual funding.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-52
Approved |
Admin Mod. |
30 |
$1,100,795 |
8-6-10
Letter
|
8-9-10
Letter
|
N/A |
| TIP revision 09-52 revises 30 projects with
a net increase in funding of $1.1 million. Among these changes,
the amendment: Splits two American Recovery and Reinvestment
Act (ARRA) grouped listings into 23 individual projects to
allow for better tracking of the projects, and reconciles
project costs to actual funding; Updates the funding plan
for three ARRA grouped listings and the Osgood Road rehabilitation
project to add in ARRA cost savings; and Updates the back
up list of Grouped Listing – LS&R Rehab Projects
to add in two Value Pilot Pricing Program funded planning
study projects and update the cost of other locally funded
projects. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
09-51
Approved |
Admin Mod. |
39 |
$2,556,329 |
7-30-10
Letter
|
8-02-10
Letter
|
N/A |
| TIP revision 09-51 revises 39 projects with
a net decrease in funding of $2.6 million. Among these changes,
the amendment: Changes the fund source of 33 locally funded
projects to STIP funds to reflect the 2010 STIP as adopted
by California Transportation Commission (CTC) on 5/20/10;
and Updates the funding plan for five projects to reflect
CTC action and a reduction in cost of the companion funding
plan of the Freeway Performance Initiative (REG090003). The
changes made with this revision will not affect the air quality
conformity or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-50
Approved |
Admin Mod. |
112 |
$3,519,523 |
7-28-10
Letter
|
7-30-10
Letter
|
N/A |
| TIP revision 09-50 revises 112 projects including
seven grouped listings with a net decrease in funding of
$3.5 million. Among these changes, the amendment:1) Splits
the six American Recovery and Reinvestment Act (ARRA) funded
grouped listings into 87 individual projects to allow for
better tracking of the projects and reconcile project costs
to actual funding; and Updates the back-up list and cost
of the Grouped Listing - JARC FY 09-10 – for large
urbanized area projects by $65,828. The changes made with
this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-49
Approved |
Admin Mod. |
74 |
$15,098,814 |
6-9-10
Letter
|
6-10-10
Letter |
N/A |
| Revision 09-49 revises 74 projects including
four American Recovery and Reinvestment Act (ARRA) funded
grouped listings with a net increase in funding of $15.1
million. Among these changes, the amendment: Updates the
project cost of the Samtrans: Preventive Maintenance project
(SM-030023) by adding $3.9 million in FTA Section 5307 funds
and approximately $1 million in Other Local funds in FY11;
and updates the back-up list and cost of the Caltrans managed
SHOPP – Collision Reduction Program by $4.8 million.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-48
Approved |
Amendment |
103 |
$393,542,086 |
5-26-10
Letter
|
7-19-10
Letter |
7-29-10
Letter |
| Revision 09-48 is an all transit TIP amendment
that revise 103 projects with a net increase in funding of
approximately $393.5 million. The amendment programs $350
million in FTA Section 5307 and FTA Section 5309 Fixed Guideway
(FG) funds for FY 2010-11, as adopted by the commission through
the San Francisco Bay Area Regional Transit Capital Priorities
program. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
09-47
Approved |
Amendment |
106 |
$596,578,567 |
5-26-10
Letter
|
7-7-10
Letter
|
7-21-10
Letter |
| Revision 09-47 is an amendment that revises
106 projects with a net increase in funding of approximately
$596.6 million. Among these changes, the amendment: Updates
the funding plan for the Transbay Term/Caltrain Downtown
Ext - Ph.1 (SF-010015) project to primarily include $400
million in High Speed Rail Revenues that have been reserved
for the project through the American Recovery and Reinvestment
Act program; Deletes the Ferry Infrastructure between Treasure
Island and SF (SF-090014) project as it is a duplicate version;
and Updates the funding plan for the SFGO-Corridor Management
(SF-070030) project to increase the cost by $23.3 million
($255,000 in FY 2009-1010 earmark funds; $15 million in CMAQ
funds; $6 million in advance construction local funds and
$1.9 million in Sales Tax Measure funds). The changes made
with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-46
Approved |
Admin Mod. |
50 |
$12,499,972 |
5-3-10
Letter |
5-13-10
Letter |
N/A |
| Administrative modification 09-46 revises 50
projects with a net increase in funding of $12.5 million.
Among these changes, the amendment: Transfers $2.5 million
from the SamTrans - Replacement of the 1993 Gillig Fleet
(SM-050036) project to the SamTrans – Preventive Maintenance
(SM-03003) project and adds another $1.5 million to the latter
in FY11 funds; Updates the project cost of the Ferry channel & berth
dredging project (MRN990017) by $2.5 million and the VTA:
Rail Substation Rehab/Replacement project (SCL050049) by
$1.9 million. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
09-45
Approved |
Amendment |
54 |
$155,116,596 |
4-28-10
Letter |
5-24-10
Letter
|
6-2-10
Letter |
| Amendment 09-45 revises 54 projects with a
net increase in funding of approximately $155.1 million.
Among these changes, the amendment: Archives 27 completed
projects from the TIP - thirteen local streets and roads
projects, three highway projects and eleven transit projects;
Adds two new exempt projects to the TIP: Solano County -
2011 Pavement Overlay Program (SOL090027) with $1.8 million
in STP funds and $235,000 in local match funds and the Bayshore
Corridor North South Bikeway Project (SM-090041) with $803,000
in RIP-TE funds; Updates the back-up list and increases project
costs of the Caltrans managed Grouped Listings for Highway
Safety improvement Program (HSIP) by $11.8 million; Revises
fund sources for the Central Subway project, transit rehabilitation
projects, and preventive maintenance for AC Transit and SFMTA
to reflect the funding exchange with CMAQ funds. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-44
Approved |
Admin Mod. |
34 |
$3,124,916 |
4-19-10
Letter |
4-21-10
Letter |
N/A |
| Administrative modification 09-44 revises 34
projects with a net increase in funding of $3.1 million.
Among these changes, the revision: Transfers $2.5 million
from the Ferry Service - Berkeley/Albany project (MTC050027)
to the SF Ferry Terminal/Berthing Facilities (MTC050029)
project; Updates the cost of the Golden Gate Bridge Seismic
Retrofit, Ph: 1-3A project (MRN970016) by $1.9 million in
Earmark funds; and Updates the cost of the CCCTA: Preventive
Maintenance Program (CC-030034) by $1 million ($827,797 in
FTA Section 5307 and $206,949 in other local funds). The
changes made with this revision will not affect the air quality
conformity or conflict with the financial constraint requirements. |
09-43
Approved |
Amendment |
26 |
$2,505,243 |
3-24-10
|
3-29-10
Letter |
4-15-10
Letter
|
| Revision 09-43 revises 26 projects with a net
decrease in funding of in funding of approximately $2.5 million.
Among these changes, the amendment: deletes 13 completed
projects from the TIP (nine local streets and roads projects;
two highway projects and two transit projects); deletes three
sound wall projects because the funding has been redirected
to cover state funding shortfalls; updates the back-up list
and reduces project costs of the Caltrans managed SHOPP Grouped
Listings for Roadway Preservation by $31.5 million; and update
the cost of the AC Transit: Preventive Maintenance Program
(ALA991070) to add in $31.3 million in FTA Section 5307 funds
and $7.8 million in local funds. The funds are being transferred
in from the Over-the-Road Coach Replacements project (ALA090033)
and the NABI Bus Replacement project (ALA090034). The bus
replacement projects are being funded with Proposition 1B – SLPP;
Proposition 1B – PTMISEA; and Other Local funds.. The
changes made with this revision will not affect the air quality
conformity or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-42
Approved |
Admin Mod |
30 |
$8,493,232 |
4-16-10
Letter |
4-19-10
Letter |
N/A |
| TIP revision 09-42 revises 30 projects including
9 American Recovery and Reinvestment Act (ARRA) funded grouped
listings with a net increase in funding of $8.5 million.
Among these changes, the amendment: Updates the back-up list
and cost of the Caltrans managed Highway Bridge Program by
$4.9 million; and Updates the project cost of the SF Downtown
Parking Pricing project (SF-070040) by $4 million. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-41
Approved |
Admin Mod |
1 |
$0 |
2-19-10
Letter |
2-22-10
Letter |
N/A |
| Revision 09-41 revises only the American Recovery
and Reinvestment Act (ARRA) funded grouped listing for transit
operations and rehabilitation projects by moving funds between
projects with no net change in fundingThe changes made with
this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-40
Approved |
Amendment |
32 |
$37,555,651 |
2-24-10
Letter
|
3-29-10
Letter |
4-15-10
Letter |
| Revision 09-40 revises 32 projects with a net
increase in funding of approximately $37.6 million. Among
these changes, the amendment: 1) Deletes ten completed projects
from the TIP (seven local streets and roads projects; two
highway projects and one transit project); 2) Deletes the
Golden Gate Transit: ADA Paratransit Assistance(MRN99T001)
because all the funds (1,148,960 in FY09 FTA 5307 funds,
$1,182,151 in FY10 FTA 5307 and $591,000 in Other Local funds)
are being transferred into Radio Communication System project
(MRN010035) and Facilities Rehabilitation project (MRN050025)
respectively. 3) Adds the Climate Initiatives Program Public
Education funded with $10 million in CMAQ funds and $1.3
million in TFCA funds; 4) Updates the back-up list and project
cost of the FTA non-urbanized formula grant program to increase
FY10 5311 funds by $1,881 and Other Local funds by $5,823,200;
and 5) Updates the back-up list and project costs of three
Caltrans managed SHOPP Grouped Listings: Collision Reduction
increases by $8.0 million; Emergency response increases by
$7.8 million; and Bridge Preservation increases by $5.1 million.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
09-39
Approved |
Amendment |
4 |
$70,000,000 |
2-17-10
Letter |
2-18-10
Letter |
2-19-10
Letter |
| Revision 09-39 was approved by the MTC Commission
on January 27, 2010, and effective as of February 17, 2010.
The amendment removes $70 million in American Reinvestment
and Recovery Act (ARRA) Transit Capital Assistance Funding
from the BART sponsored Oakland Airport Connector project,
and reprograms the $70 million of ARRA funds in three projects
as adopted by the Commission (Tier 2 projects): $67.5 million
to a new grouped listing of Transit operations and rehabilitation
projects; $0.5 million to the Vacaville Intermodal Station
project; and $2.0 million to the Vallejo Ferry Terminal Inter-modal
Facility.The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-38
Pending |
Amendment |
1 |
$270,000,000 |
1-27-10
Letter |
Pending |
Pending |
| Revision 09-38 amends in potential FTA revenues
for a future Jobs Bill totaling $343,148,640 as well as one
locally-funded lump sum or Grouped Listings for operations
and rehabilitation projects totaling $270,000,000. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-37
Approved |
Amendment |
3 |
$129,500,000 |
1-27-10
Letter |
1-29-10
Letter |
2-18-10
Letter |
| Revision 09-37 amends in potential FHWA revenues
for a future Jobs Bill totaling $438,517,792 as well as three
locally-funded lump sum or Grouped Listings for rehabilitation
and safety projects totaling $129,500,000. While under normal
operating procedures, staff would not recommend amending
in federal revenues for new programs until they have been
secured through final federal approval, we have been advised
by both Caltrans and FHWA that this deviation from typical
practice will be allowed in order to be prepared and able
to respond to tight deadlines. The changes made with this
revision will not affect the air quality conformity or conflict
with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-36
Approved |
Admin Mod |
50 |
$13,530,726 |
3-3-10
Letter
|
3-3-10
Letter
|
N/A |
| Revision 09-36 revises 50 projects with a net
funding increase of approximately $13.5 million. Among other
changes, the revision updates one American Recovery and Reinvestment
Act (ARRA) funded grouped listing for Local streets and Roads
rehabilitation projects in San Francisco to accommodate reprogramming
of ARRA cost savings. The other significant changes are updates
to the Caltrans managed grouped listings for Collision Reduction
(MTC050011 increases by $3.8 million); Bridge Preservation
(VAR991005 increases by $3.3 million); and Emergency Response
(REG070001 increases by $4.7 million). The changes made with
this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-35
Approved |
Admin Mod |
6 |
$587,000 |
12-22-09
Letter
|
12-22-09
Letter
|
N/A |
| TIP revision 09-35 revises six projects with
a net decrease in funding of approximately $587,000. The
revision updates two Grouped Listings funded with American
Recovery and Reinvestment Act (ARRA) funds. These changes
allow project sponsors to reinvest some of their cost savings
and update the back-up list. The revision also updates the
funding plan of the US 101 Doyle Drive Replacement project
(SF-991030) to add in $73.9 million in state ARRA SHOPP funds
in place of existing SHOPP funds with no net change on total
project cost. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-34
Approved |
Admin Mod |
12 |
$2,399,951 |
12-17-09
Letter
|
12-17-09
Letter
|
N/A |
| TIP revision 09-34 revises 12 projects with
a net increase in funding of approximately $2.4 million.
The revision updates three Grouped Listings funded with American
Recovery and Reinvestment Act (ARRA) funds. These changes
allow project sponsors to reinvest some of their cost savings
and update the back-up list. The revision also updates the
funding plan of the Freeway Performance Initiative project
(REG090003) to reconcile and reduce the regional element
ARRA funds by $4,356,050 to match actual obligation. These
ARRA funds are being added into the Santa Clara: US 101 /
Tully Road Interchange Modifications project (SCL050033)
in place of existing Other Local funds, in accordance with
the Commission action taken on December 16, 2009. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-33
Approved |
Amendment |
42 |
$145,413,145 |
12-16-09
Letter
|
12-30-09
Letter
|
1-22-10
Letter |
| Revision No. 09-33 is an amendment that revises
42 projects with a net increase in funding of approximately
$145.4 million. The amendment also serves to update the fiscal
constraint demonstration of the TIP to show a decrease in
revenues, including $174 million in private funding and approximately
$6 billion in local revenues (17% of the total TIP revenues)
due to current economic factors and partly due to the reconciliation
of available capital revenues. Even with these revenue adjustments,
the TIP remains financially constrained. Noteworthy project
changes in the amendment are as follows: deletes 25 completed
projects from the TIP (9 local streets and roads projects,
2 highway projects; and 14 transit projects) and one project
because the proposed local funds for the project did not
materialize (Gilroy - Railroad Ave. Streetscape project);
updates the back-up list and project cost of the Caltrans
managed Grouped Listing for Highway Bridge Program to include
$166.7 million in new programming; updates the funding plan
for the BART Oakland Airport Connector project to remove
$174 million in private funds and $36.2 million in Other Local
funds, and add $101.6 million in TIFIA funds, $47.2 million
in RM2 funds, $20 million in SLPP funds, $12.8 million in
PTMISEA funds and $12.7 million in XTRAN funds; updates the
funding plan for the Transbay Transit Center - TIFIA Loan
Debt Service based on TIFIA loan agreement by $50.7 million
and transfers $17.5 million in CMAQ funds from the AC Transit
sponsored Enhanced Bus - Telegraph/Intl/East 14th project
(ALA050017) to the new AC Transit - Operating Service project
(ALA090051) conditioned on approval by MTC at its December
16, 2009 meeting of the reassignment of $35 million in CMAQ
funds (MTC Resolution No. 3831, Revised). The changes made
with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-32
Approved |
Admin Mod |
46 |
$400,799 |
12-9-09
Letter
|
12-10-09
Letter
|
N/A |
| TIP revision 09-32 revises 46 projects with
a net decrease in funding of approximately $401,000. The
revision updates seven Grouped Listings funded with American
Recovery and Reinvestment Act (ARRA) funds. These changes
allow project sponsors to reinvest some of their cost savings
and update the back-up list. The changes made with this revision
will not affect the air quality conformity or conflict with
the financial constraint requirements. |
09-31
Approved |
Amendment |
74 |
$23,763,429 |
11-18-09
Letter
|
12-9-09
Letter
|
1-7-10
Letter |
| Revision No. 09-31 is an amendment that revises
74 projects with a net increase in funding of approximately
$23.8 million. The significant changes in the amendment are
as follows: deletes 63 completed projects from the TIP (42
local streets and roads projects, 2 highway projects; and
19 transit projects); adds one new MTC managed grouped listing
for New Freedom funds for FY08 and FY09 for large urbanized
areas totaling $5.8 million; adds $6.4 million in ARRA TIGER
funds to the AC Transit sponsored Zero Emission Bus Advanced
Demonstration project; updates the funding plan for the San
Mateo County Traffic Incident Management project to add $1M
in RIP funds from the Willow Road Interchange project (SM010047);
$500K in RIP funds, $2.3M in TLSP funds and $4M in Other
Local funds; and updates back-up list and project cost of
the Caltrans managed Grouped Listing for railroad crossings
to include $6.6 million in Section 130 Funds in FY 2010.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-30
Approved |
Amendment |
48 |
$4,768,053 |
10-28-09
Letter
|
12-1-09
Letter
|
12-10-09
Letter |
| TIP Amendment 09-30 revises 48 projects with
a net increase in funding of approximately $4.8 million.
Among these changes, the amendment: 1) Deletes thirty completed
projects from the TIP (twenty local streets and roads projects
and ten transit projects) and the Golden Gate Transit project
to replace 34 - 1991 40' TMC buses (MRN050023) because all
the funds ($8,293,951 in FY 2009 Section 5307 funds and $2,073,488
of corresponding local match) are being transferred to the
Facilities Rehabilitation Project (MRN050025). 2) Adds one
new Caltrans managed SHOPP Grouped Listing for Highway Maintenance
with four projects totaling $19.1 million. 3) Updates the
back-up list and project costs of four Caltrans managed SHOPP
Grouped Listings - Mandates and Prop 1B decrease by $52.9
million to remove a state cash funded project from the TIP,
because it does not need federal reimbursement; Emergency
response increases by $23.9 million due increase in construction
costs for various projects; Collision Reduction increases
by $17.9 million and Mobility decreases by $6.3 million.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
09-29
Approved |
Admin Mod |
58 |
$806,640 |
11-10-09
Letter
|
11-12-09
Letter
|
N/A |
| TIP revision 09-29 revises 58 projects with
a net decrease in funding of approximately $807,000. Among
other changes, the revision updates nine Grouped Listings
funded with American Recovery and Reinvestment Act (ARRA)
funds. These changes allow project sponsors to reinvest some
of their cost savings and update the back-up list. Among
other changes, the revision also updates 14 regional planning
projects to reflect the commission approval of the STP/CMAQ
programming for these projects. The changes made with this
revision will not affect the air quality conformity or conflict
with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-28
Approved |
Admin Mod |
25 |
$1,668,172 |
9-16-09
Letter |
9-17-09
Letter |
N/A |
| TIP revision 09-28 revises 25 projects with
a net increase in funding of approximately $1.7 million.
Among other changes, the revision updates 11 Grouped Listings
funded with American Recovery and Reinvestment Act (ARRA)
funds. These changes allow project sponsors to reinvest some
of their cost savings and use the recent FTA operations flexibility.
The revision also updates the funding plans of various projects
including changes in the US 101 Doyle Drive Replacement project
($12.2M in CON phase funds being reprogrammed to ROW phase
to address corresponding change in cost for the phases) and
I-580 TriValley Corridor - EB HOV/HOT Lanes project ($7.5M
in CON phase funds being reprogrammed to PE phase). The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-27
Approved |
Amendment |
16 |
$57,660,000 |
9-23-09
Letter |
9-28-09
Letter |
10-27-09
Letter |
| TIP Amendment 09-27 revises 16 projects with
a net decrease in funding of approximately $57.7 million.
Among these changes, the amendment: Adds four new projects
into the TIP (two planning projects, one bike project and
one local road rehabilitation project); deletes two projects
from the TIP: the Grand/MacArthur Blvd Corridor Improvements
project because the funds are being used for the new Study
Contra Flow Lanes on Bay Bridge project; and the Alameda-Oakland
Ferry Main Street Barge project because the listing was a
duplicate of an existing project; updates the back-up list
and project costs of four Caltrans managed SHOPP Grouped
Listings (Collision Reduction increases by $62.9 million
with the addition of several projects, including safety projects
on SR84 and SR152; Emergency Response increases by $43.2
million with the addition of several projects, including
a safety project on Route 580; Bridge Preservation decreases
by $151.2 million to remove duplicate programming in the
back-up listing; Roadway Preservation decreases by $18.5
million); and updates the back-up list and project cost of
the Grouped Listing funded with FTA 5307 ARRA funds for the
Concord Urbanized Area to add operating assistance projects.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-26
Approved |
Admin Mod |
17 |
$3,553,253 |
8-20-09
Letter |
8-20-09
Letter |
N/A |
| TIP revision 09-26 revises 17 projects with
a net decrease in funding of approximately $3.6 million.
Among other changes, the revision updates six Grouped Listings
funded with American Recovery and Reinvestment Act (ARRA)
funds. These changes allow project sponsors to reinvest some
of their cost savings. The revision also updates six Caltrans
managed Grouped Listings. Another significant change in this
revision is the update to the funding plan of the Sonoma
Marin Area Rail Corridor project by removing $5 million in
FTA section 5309 funds that were not allocated. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
09-25
Approved |
Admin Mod |
16 |
$6,218,251 |
8-6-09
Letter |
8-10-09
Letter |
N/A |
| TIP revision 09-25 makes revisions to 16 projects
with a net increase in funding of approximately $6.2 million.
Among other changes, the revision updates the project costs
of thirteen regional planning projects to include STP or
CMAQ funds and updates the local matching funds. The funding
plan of AC Transit’s Preventive Maintenance program
was updated to include $1.8 million in FTA 5307 funds transferred
in from the AC Transit Facilities Upgrade project. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-24
Approved |
Admin Mod |
10 |
$1,465,021 |
7-23-09
Letter |
7-23-09
Letter |
N/A |
| TIP revision 09-24 makes revisions to 10 projects
with a net decrease in funding of approximately $1.5 million.
Among other changes, the revision updates the back-up list
for the American Recovery and Reinvestment Act (ARRA) funded
- San Mateo Local Streets and Roads Rehabilitation Projects
Grouped Listing with a net decrease in funding of $4.4 million.
The revision updates the project cost of the Santa Rosa Bus:
Operating Assistance project to include $1.6 million in additional
funds and updates the funding plan of the Doyle Drive project
to reprogram $17.5 million in SHOPP Funds from FY 2006-07
to FY 2008-09. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
09-23
Approved |
Amendment |
85 |
$437,928,801 |
7-22-09
Letter |
8-10-09
Letter |
8-14-09
Letter |
| TIP Amendment 09-23 is an all transit TIP amendment
that makes revisions to 85 projects with a net increase in
funding of approximately $437.9 million. The amendment programs
$350 million in FTA Section 5307 and FTA Section 5309 Fixed
Guideway (FG) funds for FY 2009-10, as adopted by the commission
through the San Francisco Bay Area Regional Transit Capital
Priorities program. The changes made with this revision will
not affect the air quality conformity or conflict with the
financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-22
Approved |
Amendment |
19 |
$449,128,391 |
7-22-09
Letter |
8-5-09
Letter |
8-21-09
Letter |
| TIP Amendment 09-22 makes revisions to 19 projects
with a net increase in funding of approximately $449.1 million.
The amendment adds six new regional projects into the TIP
funded with Other Local funds. The significant change in
this amendment is the updated funding plan for the Transbay
Terminal Project with an updated cost of $1.2 billion, with
the funds being added in FY13 and FY14. The amendment also
programs $70 million in American Recovery and Reinvestment
Act (ARRA) funds to the Oakland Airport Connector project
in FY09. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
09-21
Approved |
Admin Mod |
13 |
$2,146,482 |
7-13-09
Letter |
7-13-09
Letter |
N/A |
| Revision 09-21 is an administrative modification
that makes revisions to 13 projects with a net increase in
funding of $2.1 million. Among other changes, the revision
updates the back-up lists and costs of four American Recovery
and Reinvestment Act (ARRA) grouped listings. The significant
change is the revision of the Caltrans managed grouped listing
for Emergency Response projects. For six projects in this
revision, the fund source is changed from CMAQ funds to STP
funds due to the FY 2008-09 Rescission of CMAQ Apportionment.
The changes made with this revision will not affect the air
quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-20
Approved |
Amendment |
18 |
$5,041,183 |
6-24-09
Letter |
7-6-09
Letter |
7-21-09
Letter |
| TIP Amendment 09-20 makes revisions to 18 projects
with a net decrease in funding of approximately $5 million.
The amendment adds seven new projects into the TIP: three
transit projects (scheduled to receive part of the $15.3
million in American Recovery and Reinvestment Act (ARRA)
funds), two new planning projects (funded with Other Local
funds), one grade crossing design project (funded with TCSP
earmarks funds) and one pavement overlay project (funded
with SLPP funds and Other Local funds). The amendment also
updates funding plans of the ARRA funded SHOPP projects to
reflect actual obligations, at the request of Caltrans and
among other changes, the amendment also changes the funding
plan for the Doyle Drive Replacement Project as follows:
it moves approximately $35 million from FY 2007-08 to FY
2008-09 for the Doyle Drive Replacement Project and changes
the fund source for $80 million from Other Local funds to
AB1171 funds. The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
09-19
Approved |
Admin. Mod |
24 |
$12,048,719 |
6-29-09
Letter |
6-30-09
Letter |
N/A |
| Revision 09-19 is an administrative modification
that makes revisions to 24 projects with a net increase in
funding of $12 million. Among other changes, the revision
updates the back-up lists and costs of seven American Recovery
and Reinvestment Act (ARRA) funded grouped listings. The
significant change is the revision of the Caltrans managed
grouped listing for Bridge Preservation projects. The changes
made with this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. The
changes made with this revision will not affect the air quality
conformity or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-18
Approved |
Amendment |
34 |
$76,464,607 |
5-27-09
Letter |
6-18-09
Letter |
7-8-09
Letter |
| Revision 09-18 is an amendment that makes revisions
to a total of 34 projects with a net change in funding of
$76.5 million. It adds 12 new projects into the TIP, including
the SR 12/29/221 Soscol Junction Interchange (Flyover) Study
project with $6.3 million in State funds; 10 regional planning
projects; and a new TIP listing for the Pavement Technical
Assistance Program (P-TAP). These were split from existing
projects to mark the start of the new federal authorization
period. One significant change in this amendment is the increase
in costs of the Golden Gate Bridge - Suicide Deterrent System
project, with $5 million in FY 2010-11 and $45 million in
uncommitted funds in FY 2012-13. The changes made with this
revision will not affect the air quality conformity or conflict
with the financial constraint requirements. |
09-17
Approved |
Amendment |
28 |
$7,716,699 |
5-27-09
Letter |
6-17-09
Letter |
6-23-09
Letter |
| Revision 09-17 is an amendment that makes revisions
to a total of 28 projects with a net decrease in funding
of $7.7 million. The amendment is the Annual All Transit
or Program of Projects (POP) TIP amendment that makes revisions
to transit projects to reflect the FY 2008-09 appropriations
that were enacted in March as part of the omnibus appropriations
act and the apportionments of the FTA 5307 and 5309 Fixed
Guideway programs to urbanized areas that were released by
FTA on April 27. One significant change in this amendment
is the addition of $12.6 million to the BART Car Replacement
project. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-16
Approved |
Admin. Mod |
8 |
$6,794,240 |
5-22-09
Letter |
5-27-09
Letter |
N/A |
| Administrative modification 09-16 makes revisions
to eight American Recovery and Reinvestment Act (ARRA) funded
grouped listings with a net increase in funding of approximately
$6.8 million. The back-up lists and costs of grouped listings
are updated with this revision. The changes made with this
revision will not affect the air quality conformity or conflict
with the financial constraint requirements. |
09-15
Approved |
Admin. Mod |
41 |
$2,020,832 |
6-3-09
Letter |
6-4-09
Letter |
N/A |
| Revision 09-15 is an administrative modification
that makes revisions to 41 projects with a net increase in
funding of approximately $2.02 million. Among other changes,
it updates project lists and costs of three Caltrans managed
SHOPP Grouped listings. The changes made with this revision
will not affect the air quality conformity or conflict with
the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-14
Approved |
Amendment |
27 |
$6,591,745 |
4-22-09
Letter |
5-28-09
Letter |
6-10-09
Letter |
| Amendment 14 makes revisions to a total of
27 projects with a net increase in funding of approximately
$6.6 million. The amendment serves to update projects to
reflect the revised Urban Partnership Program Agreement (UPA).
Among other changes, the UPP Pre-Implementation project (SF-070044)
was deleted from the TIP and the new Congestion Pricing Study
and Coordination project (SF-090028) was added into the TIP.
The revision also adds three other new projects into the
TIP, two that program the new State Local Partnership Program
funds and one that programs the FLHP funds received. The
amendment deletes the Santa Rosa City Bus Route 19 /12 (SON070014)
project as it was duplicated in the TIP and the Caltrain
Fare Equipment Replacement project (SM-030029) as all the
funds within the TIP period are being transferred to the
Signal/Communication Rehabilitation & Upgrades project
(SM-050041). The funding plan of the I-680 Sunol Grade -
Alameda project (ALA991084) was updated to include $72 million
in Proposition 1B SHOPP funds that were originally listed
under the Grouped Listing - SHOPP - Mandated and Prop IB
(VAR991009). The changes made with this revision will not
affect the air quality conformity or conflict with the financial
constraint requirements. |
09-13
Approved |
Amendment |
6 |
$17,137,154 |
4-22-09
Letter |
5-27-09
Letter |
6-10-09
Letter |
| Amendment 13 makes revisions to 6 projects
receiving American Recovery and Reinvestment Act (ARRA) funds
with a net change in funding of approximately $17.1 million.
Among other changes, the amendment adds three new projects
(Yountville SR 29 Bicycle Safety Improvements project - NAP090001,
Pedestrian Signal Upgrades - SF-090029, and McGary Road Safety
Improvements Project - SOL090004). The amendment also adds
$10 million in ARRA funds to the Vasco Road Safety Improvements
- Contra Costa project (CC-050030). The changes made with
this revision will not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-12
Approved |
Admin. Mod. |
21 |
$1,919,712 |
4-22-09
Letter |
4-24-09
Letter
|
N/A |
| Administrative modification 09-12 makes revisions
to 21 projects receiving American Recovery and Reinvestment
Act (ARRA) funds with a net increase in funding of approximately
$1.9 million. One significant change in this revision is
the creation of the San Mateo County: Install TMS Elements
(SM-090023) project by splitting the project originally listed
in the SHOPP – Mobility Grouped Listing in the TIP
(MTC050006) to allow for easier reporting and tracking of
ARRA funds. The funding plan for the SR 24 - Caldecott Tunnel
4th Bore project was also updated by adding $104.957 million
in State ARRA funds in FY09 in place of $31 million in RIP
funds and $73.957 million in CMIA funds programmed in the
TIP. The changes made with this revision will not affect
the air quality conformity or conflict with the financial
constraint requirements. |
09-11
Approved |
Admin. Mod. |
2 |
$4,100,000 |
4-16-09
Letter |
4-16-09
Letter |
N/A |
| Administrative modification 09-11 makes revisions
to two projects receiving State American Recovery and Reinvestment
Act (ARRA) funds with a net increase in funding of approximately
$4.1 million. The changes reflect the actions taken at the
April California Transportation Commission meeting. The Marin
US 101 HOV Gap Closure project (MRN990001) received $2.1
million in State ARRA-TE funds and $2 million in RIP funds
in FY09. The funding plan for the SR 24 - Caldecott Tunnel
4th Bore project was updated by adding $92.7 million in State
ARRA funds in FY09 in place of $2.7 million in IIP funds
and $90 million in CMIA funds programmed in the TIP. Changes
made with this revision do not affect the air quality conformity
or conflict with the financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-10
Approved |
Admin. Mod. |
13 |
$7,871,342 |
4-10-09
Letter |
4-13-09
Letter |
N/A |
| Administrative modification 09-10 makes revisions
to 13 American Recovery and Reinvestment Act (ARRA) funded
grouped listings with a net decrease in funding of approximately
$7.8 million. One significant change in this revision is
the creation of a Grouped Listing for Highway Maintenance
Projects receiving ARRA funds (REG090034) by splitting the
project originally listed in the SHOPP – Roadway Preservation
Grouped Listing in the TIP (MTC050009) to allow for easier
reporting and tracking of ARRA funds. All other changes primarily
updated the back-up lists and costs of grouped listings.
Changes made with this revision do not affect the air quality
conformity or conflict with the financial constraint requirements. |
09-09
Approved |
Admin. Mod. |
17 |
$13,711,731 |
4-09-09
Letter |
4-13-09
Letter |
N/A |
Administrative modification 09-09 makes
revisions to 17 projects with a net increase in funding
of approximately $13.7 million. One significant change
in this revision is the addition of four million dollars
in FTA 5309 New Starts funds to AC Transit’s Enhanced
Bus - Telegraph/International/East 14th project (ALA050017).
The Caltrans managed Grouped Listing for State Highway
Operations and Protection Program (SHOPP) – Emergency
Response was updated to include three new projects in FY
2008-09 and one in FY 2009-10 with a net increase in cost
of $2.4 million. Changes made with this revision do not
affect the air quality conformity or conflict with the
financial constraint requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-08
Approved |
Admin. Mod. |
6 |
$3,150,000 |
3-17-09
Letter |
3-18-09
Letter |
N/A |
| Administrative modification 09-08 makes revisions
to 6 projects with a net change in funding of $3.15 million.
The revision programs $132,298,000 in federal American Recovery
and Reinvestment Act (ARRA) funds in place of existing funding
and adds Highway Maintenance projects. Among other changes,
the US-101 Doyle Drive Replacement project in San Francisco
(SF-991030) received $50,000,000 in federal ARRA-SHOPP funding
instead of later local funds to allow a segment of the project
to be delivered sooner. |
09-07
Approved |
Amendment |
26 |
$485,263,640 |
2-25-09
Letter |
3-2-09
Letter |
3-17-09
Letter |
| TIP Amendment 09-07 amends in 26 new grouped
listings into the TIP with a net change in funding of $485.3
million in American Recovery and Reinvestment Act (ARRA)
and local funds. This revision programs $395.1 million of
the ARRA revenues amended into the TIP as part of Revision
09-05. Changes made with this revision do not affect the
air quality conformity or conflict with the financial constraint
requirements. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-06
Approved
related documents |
Amendment |
151 |
$12,507,578,454 |
4-22-09
Letter |
5-12-09
Letter |
5-29-09
Letter |
| Amendment #09-06 serves to conform the 2009
TIP to the new Transportation 2035 Plan for air quality conformity
purposes. TIP Amendment 09-06 modifies approximately 17 projects
and adds approximately 134 non-exempt projects with a net
increase in funding of roughly $12.5 billion, including the
addition of new projects as a result of recently approved
voter initiatives, such as the Bay Area Rapid Transit District’s
(BART’s)- Warm Springs to Silicon Valley with a total
cost of $7.587 billion and Sonoma Marin Area Rail Corridor
(SMART) project for $646 million; it adds the San Jose International
Airport People Mover project for $512 million; adds the Freeway
Performance Initiative for $222 million and adds the Bayview
Transportation Improvements project for $126 million. The
amendment also adds various Proposition 1B Trade Corridors
Improvement Fund (TCIF) projects recently adopted by the
California Transportation Commission (CTC); adds new projects
approved by the CTC in the 2008 State Transportation Improvement
Program (STIP), reconciles project costs to the new RTP (T-2035),
and adds or deletes other air quality non-exempt projects
consistent with the new RTP. The conformity analysis done
for the Transportation 2035 Plan also serves to re-conform
the entire 2009 TIP |
09-05
Approved
|
Amendment |
0 |
$1,188,148,640 |
2-25-09
Letter |
2-26-09
Letter |
3-17-09
Letter |
| Amendment 09-05 amends in the funding revenues
for the American Recovery and Reinvestment Act (ARRA) to
the tune of $1.18 Billion. This amendment adds in additional
revenues only, to demonstrate financial constraint for the
2009 TIP. Several projects to be funded with ARRA funding
are included in a companion Amendment 09-07. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-04
Approved |
Amendment |
64 |
$303,471,101 |
2-25-09
Letter |
3-3-09
Letter |
3-17-09
Letter |
| TIP Amendment 09-04 makes revisions to 64 projects
with a net increase in funding of $303,471,101. Among other
changes, it updates project lists and costs of several SHOPP
Grouped listings. The amendment updates the funding plan
to identify $35 million in CMAQ funds and advance these funds
from outside the TIP period for AC Transit’s Enhanced
Bus - Telegraph/Intl/East 14th project as part of the implementation
of the Resolution 3434 Strategic Plan. It adds the High Street
Bridge rehabilitation project back into the TIP and amends
ten new projects into the TIP. Of these, four projects received
FTA Transit in Parks Program (5320) grant funds and the revenues
are accounted for as part of this revision. The amendment
programs the second cycle funds of the Safe Routes to School
grants into the TIP, adds in FY10 and FY11 funds into the
Highway Safety Improvement Program and archives seven projects. |
09-03
Approved |
Admin. Mod |
15 |
$361,802 |
1-29-09
Letter |
2-10-09
Letter |
N/A |
| Administrative modification 09-03 updates the
project listing and funding for revisions to 15 projects
with a net funding change of $361,802. One significant change
in this revision includes combining the Doyle Drive Congestion
Tolling project (SF-070043) into the Doyle Drive Replacement
project (SF-991030), to reflect the changes made through
administrative modification 07-28 which revised the 2007
TIP after the Commission had approved the 2009 TIP. Another
change is to split the existing New Freedom Grouped Listing
(REG070013) into three separate New Freedom (NF) grouped
listings: NF FY06 Small UA (REG070013), NF FY07 Large UA
(REG090004) and NF FY07/09 Small UA (REG090005) with updated
project costs and lists to provide clarity. |
Revision
(PDF)
|
Type
|
Number of Projects |
Net Funding Change |
MTC
Approval
Date
|
Caltrans
Approval
Date
|
FTA/FHWA
Approval
Date
|
09-02
Approved |
Amendment |
72 |
$28,081,615 |
12-31-08
Letter |
1-7-09
Letter |
1-23-09
Letter |
| Revision 09-02 is an amendment referred by
the Programming and Allocations Committee on December 10,
2008. It makes revisions to 72 projects with a net
increase in funding of $28,081,615. Among other changes,
it updates funding amounts to reflect changes made through
Amendment 07-26 which revised the 2007 TIP after the Commission
had approved the 2009 TIP. This amendment also reconciles
STP/CMAQ funding that was obligated in FY 2007/08, modifies
projects to reflect actions taken by the California Transportation
Commission and makes adjustments to various grouped project
listings at the request of Caltrans. Changes made with this
revision do not affect the air quality conformity or conflict
with the financial constraint requirements. |
09-01
Approved |
Admin Mod |
29 |
$2,880,741 |
12-15-08
Letter |
12-16-08
Letter |
N/A |
| Revision 09-01 is an administrative modification
approved by MTC's Executive Director under delegation of
authority on December 15, 2008. It makes revisions to 29
projects with a net increase in funding of $2,880,741. Among
other minor changes, it updates funding amounts, fund sources,
project descriptions and project sponsors to reconcile with
changes made through administrative modifications 07-27 and
07-28 which revised the 2007 TIP after the Commission had
approved the 2009 TIP. Changes made with this revision do
not affect the air quality conformity determination or conflict
with financial constraint requirements. |
Back to main TIP page |
|