Search title image

Transportation Improvement Program (TIP)

2009 TIP Revisions

Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-60
Proposed

Amendment 11 $18,723,852 10-27-10
Letter
11-23-10
Letter
Pending
TIP revision 09-60 archives 11 completed projects from the TIP – 6 local streets and roads projects and 5 transit projects, with a net decrease in funding of approximately $18.7 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-59
Approved

Admin Mod. 1 $3,200,000 10-14-10
Letter

10-14-10
Letter
N/A
TIP revision 09-59 revises revises one project with a net increase in funding of $3.2 million. This revision updates the funding plan for the US 101 Doyle Drive project to reflect the replacement of ARRA-SHOPP funds with AC-STATE-SHOPP funds and adds $3.7 million in FLHP earmark funds. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-58
Approved

Admin Mod. 7 $500,000 9-22-10
Letter
9-23-10
Letter
N/A
TIP revision 09-58 revises seven projects with a net increase in funding of $500,000. Among these changes, the funding plans of three projects: I-880 North, Safety Improvements project (ALA050019); East-West Connector in Fremont and Union City (ALA978004) and BART Oakland Airport Connector (BRT990002) were updated to reflect the CTC action taken on September 22, 2010. The revision also updates the funding plan of the regional planning project to add in $300,000 in federal planning funds and $300,000 in local matching funds. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-57
Approved

Admin Mod. 1 $0 9-9-10
Letter
9-9-10
Letter
N/A
TIP revision 09-57 updates the funding plan of the Freeway Performance Initiative Project (REG090003) to change the fund source of $20 million in Other Local funds programmed in the CON phase to $20 million in CMAQ funds in the PE phase. There is no net change in funding. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-56
Approved

Amendment 236 $190,278,006 9-22-10
Letter
10-15-10
Letter
10-17-10
Letter
Revision 09-56 is an amendment that revises 236 projects with a net decrease in funding of approximately $190.3 million. Among these changes, the amendment: Adds two AC Transit projects back into the TIP (ALA070047 and ALA070055) to allow the obligation of funds; Deletes two duplicate projects from the TIP: Carlson Blvd Improvements, Tehama to San Jose (CC-090006) and the SR 12/29/221 Intersection Improvements (NAP010001); Deletes eight projects (CC-070060, CC-070097, NAP050008, SF-010023, SF-070015, SF-070041, SOL990019 and SOL990021), because the funding originally programmed had been redirected and deletes three grouped listings (REG090061, REG090062, REG090063) that were originally programmed when the Jobs Bill was anticipated; and Archives 230 completed projects from the TIP – 134 local streets and roads projects; 14 highway project; 4 toll bridge projects and 77 transit projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-55
Approved

Admin Mod. 5 $744,523 8-30-10
Letter
8-31-10
Letter
N/A
TIP revision 09-55 revises five projects with a net increase in funding of $744,523. Among these changes, the funding plans of three projects were updated to add in ARRA cost savings. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-54
Approved

Amendment 111 $101,563,375 7-28-10
Letter
8-18-10
Letter
9-1-10
Letter
Revision 09-54 revises 111 projects with a net increase in funding of approximately $101.6 million. Among these changes, the amendment: Programs $15 million in federal STP and CMAQ funds; Adds a new grouped listing for Transportation Enhancements projects funded under the regional Transportation for Livable Communities program with $43 million in CMAQ funds and $11.7 million in Other Local funds; Adds $10.8 million in ISTEA earmarks to the Sonoma Marin Area Rail Transit (SMART) Extension to Larkspur project (SON070025); Deletes the San Rafael: Street Resurfacing Program – SLPP (MRN090015) because the funds were redirected to other projects; and Archives 98 completed projects from the TIP – seventy five local streets and roads projects; four highway project; two regional project and seventeen transit projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-53
Approved

Admin Mod. 46 $2,131,055 8-6-10
Letter
8-10-10
Letter
N/A
TIP revision 09-53 revises 46 projects including three grouped listings with a net decrease in funding of $2.1 million. Among these changes, the amendment splits three American Recovery and Reinvestment Act (ARRA) grouped listings into 39 individual projects to allow for better tracking of the projects, and reconciles project costs to actual funding. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-52
Approved

Admin Mod. 30 $1,100,795 8-6-10
Letter
8-9-10
Letter
N/A
TIP revision 09-52 revises 30 projects with a net increase in funding of $1.1 million. Among these changes, the amendment: Splits two American Recovery and Reinvestment Act (ARRA) grouped listings into 23 individual projects to allow for better tracking of the projects, and reconciles project costs to actual funding; Updates the funding plan for three ARRA grouped listings and the Osgood Road rehabilitation project to add in ARRA cost savings; and Updates the back up list of Grouped Listing – LS&R Rehab Projects to add in two Value Pilot Pricing Program funded planning study projects and update the cost of other locally funded projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-51
Approved

Admin Mod. 39 $2,556,329 7-30-10
Letter
8-02-10
Letter
N/A
TIP revision 09-51 revises 39 projects with a net decrease in funding of $2.6 million. Among these changes, the amendment: Changes the fund source of 33 locally funded projects to STIP funds to reflect the 2010 STIP as adopted by California Transportation Commission (CTC) on 5/20/10; and Updates the funding plan for five projects to reflect CTC action and a reduction in cost of the companion funding plan of the Freeway Performance Initiative (REG090003). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-50
Approved

Admin Mod. 112 $3,519,523 7-28-10
Letter
7-30-10
Letter
N/A
TIP revision 09-50 revises 112 projects including seven grouped listings with a net decrease in funding of $3.5 million. Among these changes, the amendment:1) Splits the six American Recovery and Reinvestment Act (ARRA) funded grouped listings into 87 individual projects to allow for better tracking of the projects and reconcile project costs to actual funding; and Updates the back-up list and cost of the Grouped Listing - JARC FY 09-10 – for large urbanized area projects by $65,828. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-49
Approved

Admin Mod. 74 $15,098,814 6-9-10
Letter
6-10-10
Letter
N/A
Revision 09-49 revises 74 projects including four American Recovery and Reinvestment Act (ARRA) funded grouped listings with a net increase in funding of $15.1 million. Among these changes, the amendment: Updates the project cost of the Samtrans: Preventive Maintenance project (SM-030023) by adding $3.9 million in FTA Section 5307 funds and approximately $1 million in Other Local funds in FY11; and updates the back-up list and cost of the Caltrans managed SHOPP – Collision Reduction Program by $4.8 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-48
Approved

Amendment 103 $393,542,086 5-26-10
Letter
7-19-10
Letter
7-29-10
Letter
Revision 09-48 is an all transit TIP amendment that revise 103 projects with a net increase in funding of approximately $393.5 million. The amendment programs $350 million in FTA Section 5307 and FTA Section 5309 Fixed Guideway (FG) funds for FY 2010-11, as adopted by the commission through the San Francisco Bay Area Regional Transit Capital Priorities program. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-47
Approved

Amendment 106 $596,578,567 5-26-10
Letter
7-7-10
Letter
7-21-10
Letter
Revision 09-47 is an amendment that revises 106 projects with a net increase in funding of approximately $596.6 million. Among these changes, the amendment: Updates the funding plan for the Transbay Term/Caltrain Downtown Ext - Ph.1 (SF-010015) project to primarily include $400 million in High Speed Rail Revenues that have been reserved for the project through the American Recovery and Reinvestment Act program; Deletes the Ferry Infrastructure between Treasure Island and SF (SF-090014) project as it is a duplicate version; and Updates the funding plan for the SFGO-Corridor Management (SF-070030) project to increase the cost by $23.3 million ($255,000 in FY 2009-1010 earmark funds; $15 million in CMAQ funds; $6 million in advance construction local funds and $1.9 million in Sales Tax Measure funds). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-46
Approved

Admin Mod. 50 $12,499,972 5-3-10
Letter
5-13-10
Letter
N/A
Administrative modification 09-46 revises 50 projects with a net increase in funding of $12.5 million. Among these changes, the amendment: Transfers $2.5 million from the SamTrans - Replacement of the 1993 Gillig Fleet (SM-050036) project to the SamTrans – Preventive Maintenance (SM-03003) project and adds another $1.5 million to the latter in FY11 funds; Updates the project cost of the Ferry channel & berth dredging project (MRN990017) by $2.5 million and the VTA: Rail Substation Rehab/Replacement project (SCL050049) by $1.9 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-45
Approved

Amendment 54 $155,116,596 4-28-10
Letter
5-24-10
Letter

6-2-10
Letter

Amendment 09-45 revises 54 projects with a net increase in funding of approximately $155.1 million. Among these changes, the amendment: Archives 27 completed projects from the TIP - thirteen local streets and roads projects, three highway projects and eleven transit projects; Adds two new exempt projects to the TIP: Solano County - 2011 Pavement Overlay Program (SOL090027) with $1.8 million in STP funds and $235,000 in local match funds and the Bayshore Corridor North South Bikeway Project (SM-090041) with $803,000 in RIP-TE funds; Updates the back-up list and increases project costs of the Caltrans managed Grouped Listings for Highway Safety improvement Program (HSIP) by $11.8 million; Revises fund sources for the Central Subway project, transit rehabilitation projects, and preventive maintenance for AC Transit and SFMTA to reflect the funding exchange with CMAQ funds. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-44
Approved

Admin Mod. 34 $3,124,916 4-19-10
Letter
4-21-10
Letter
N/A
Administrative modification 09-44 revises 34 projects with a net increase in funding of $3.1 million. Among these changes, the revision: Transfers $2.5 million from the Ferry Service - Berkeley/Albany project (MTC050027) to the SF Ferry Terminal/Berthing Facilities (MTC050029) project; Updates the cost of the Golden Gate Bridge Seismic Retrofit, Ph: 1-3A project (MRN970016) by $1.9 million in Earmark funds; and Updates the cost of the CCCTA: Preventive Maintenance Program (CC-030034) by $1 million ($827,797 in FTA Section 5307 and $206,949 in other local funds). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-43
Approved

Amendment 26 $2,505,243 3-24-10
3-29-10
Letter
4-15-10
Letter
Revision 09-43 revises 26 projects with a net decrease in funding of in funding of approximately $2.5 million. Among these changes, the amendment: deletes 13 completed projects from the TIP (nine local streets and roads projects; two highway projects and two transit projects); deletes three sound wall projects because the funding has been redirected to cover state funding shortfalls; updates the back-up list and reduces project costs of the Caltrans managed SHOPP Grouped Listings for Roadway Preservation by $31.5 million; and update the cost of the AC Transit: Preventive Maintenance Program (ALA991070) to add in $31.3 million in FTA Section 5307 funds and $7.8 million in local funds. The funds are being transferred in from the Over-the-Road Coach Replacements project (ALA090033) and the NABI Bus Replacement project (ALA090034). The bus replacement projects are being funded with Proposition 1B – SLPP; Proposition 1B – PTMISEA; and Other Local funds.. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-42
Approved

Admin Mod 30 $8,493,232 4-16-10
Letter
4-19-10
Letter
N/A
TIP revision 09-42 revises 30 projects including 9 American Recovery and Reinvestment Act (ARRA) funded grouped listings with a net increase in funding of $8.5 million. Among these changes, the amendment: Updates the back-up list and cost of the Caltrans managed Highway Bridge Program by $4.9 million; and Updates the project cost of the SF Downtown Parking Pricing project (SF-070040) by $4 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-41
Approved

Admin Mod 1 $0 2-19-10
Letter
2-22-10
Letter
N/A
Revision 09-41 revises only the American Recovery and Reinvestment Act (ARRA) funded grouped listing for transit operations and rehabilitation projects by moving funds between projects with no net change in fundingThe changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-40
Approved

Amendment 32 $37,555,651 2-24-10
Letter
3-29-10
Letter
4-15-10
Letter
Revision 09-40 revises 32 projects with a net increase in funding of approximately $37.6 million. Among these changes, the amendment: 1) Deletes ten completed projects from the TIP (seven local streets and roads projects; two highway projects and one transit project); 2) Deletes the Golden Gate Transit: ADA Paratransit Assistance(MRN99T001) because all the funds (1,148,960 in FY09 FTA 5307 funds, $1,182,151 in FY10 FTA 5307 and $591,000 in Other Local funds) are being transferred into Radio Communication System project (MRN010035) and Facilities Rehabilitation project (MRN050025) respectively. 3) Adds the Climate Initiatives Program Public Education funded with $10 million in CMAQ funds and $1.3 million in TFCA funds; 4) Updates the back-up list and project cost of the FTA non-urbanized formula grant program to increase FY10 5311 funds by $1,881 and Other Local funds by $5,823,200; and 5) Updates the back-up list and project costs of three Caltrans managed SHOPP Grouped Listings: Collision Reduction increases by $8.0 million; Emergency response increases by $7.8 million; and Bridge Preservation increases by $5.1 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-39
Approved

Amendment 4 $70,000,000 2-17-10
Letter
2-18-10
Letter
2-19-10
Letter
Revision 09-39 was approved by the MTC Commission on January 27, 2010, and effective as of February 17, 2010. The amendment removes $70 million in American Reinvestment and Recovery Act (ARRA) Transit Capital Assistance Funding from the BART sponsored Oakland Airport Connector project, and reprograms the $70 million of ARRA funds in three projects as adopted by the Commission (Tier 2 projects): $67.5 million to a new grouped listing of Transit operations and rehabilitation projects; $0.5 million to the Vacaville Intermodal Station project; and $2.0 million to the Vallejo Ferry Terminal Inter-modal Facility.The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-38
Pending

Amendment 1 $270,000,000 1-27-10
Letter
Pending Pending
Revision 09-38 amends in potential FTA revenues for a future Jobs Bill totaling $343,148,640 as well as one locally-funded lump sum or Grouped Listings for operations and rehabilitation projects totaling $270,000,000. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-37
Approved

Amendment 3 $129,500,000 1-27-10
Letter
1-29-10
Letter
2-18-10
Letter
Revision 09-37 amends in potential FHWA revenues for a future Jobs Bill totaling $438,517,792 as well as three locally-funded lump sum or Grouped Listings for rehabilitation and safety projects totaling $129,500,000. While under normal operating procedures, staff would not recommend amending in federal revenues for new programs until they have been secured through final federal approval, we have been advised by both Caltrans and FHWA that this deviation from typical practice will be allowed in order to be prepared and able to respond to tight deadlines. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-36
Approved

Admin Mod 50 $13,530,726 3-3-10
Letter
3-3-10
Letter

N/A
Revision 09-36 revises 50 projects with a net funding increase of approximately $13.5 million. Among other changes, the revision updates one American Recovery and Reinvestment Act (ARRA) funded grouped listing for Local streets and Roads rehabilitation projects in San Francisco to accommodate reprogramming of ARRA cost savings. The other significant changes are updates to the Caltrans managed grouped listings for Collision Reduction (MTC050011 increases by $3.8 million); Bridge Preservation (VAR991005 increases by $3.3 million); and Emergency Response (REG070001 increases by $4.7 million). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-35
Approved

Admin Mod 6 $587,000 12-22-09
Letter
12-22-09
Letter

N/A
TIP revision 09-35 revises six projects with a net decrease in funding of approximately $587,000. The revision updates two Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings and update the back-up list. The revision also updates the funding plan of the US 101 Doyle Drive Replacement project (SF-991030) to add in $73.9 million in state ARRA SHOPP funds in place of existing SHOPP funds with no net change on total project cost. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-34
Approved

Admin Mod 12 $2,399,951 12-17-09
Letter
12-17-09
Letter

N/A
TIP revision 09-34 revises 12 projects with a net increase in funding of approximately $2.4 million. The revision updates three Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings and update the back-up list. The revision also updates the funding plan of the Freeway Performance Initiative project (REG090003) to reconcile and reduce the regional element ARRA funds by $4,356,050 to match actual obligation. These ARRA funds are being added into the Santa Clara: US 101 / Tully Road Interchange Modifications project (SCL050033) in place of existing Other Local funds, in accordance with the Commission action taken on December 16, 2009. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-33
Approved

Amendment 42 $145,413,145 12-16-09
Letter
12-30-09
Letter
1-22-10
Letter
Revision No. 09-33 is an amendment that revises 42 projects with a net increase in funding of approximately $145.4 million. The amendment also serves to update the fiscal constraint demonstration of the TIP to show a decrease in revenues, including $174 million in private funding and approximately $6 billion in local revenues (17% of the total TIP revenues) due to current economic factors and partly due to the reconciliation of available capital revenues. Even with these revenue adjustments, the TIP remains financially constrained. Noteworthy project changes in the amendment are as follows: deletes 25 completed projects from the TIP (9 local streets and roads projects, 2 highway projects; and 14 transit projects) and one project because the proposed local funds for the project did not materialize (Gilroy - Railroad Ave. Streetscape project); updates the back-up list and project cost of the Caltrans managed Grouped Listing for Highway Bridge Program to include $166.7 million in new programming; updates the funding plan for the BART Oakland Airport Connector project to remove $174 million in private funds and $36.2 million in Other Local funds, and add $101.6 million in TIFIA funds, $47.2 million in RM2 funds, $20 million in SLPP funds, $12.8 million in PTMISEA funds and $12.7 million in XTRAN funds; updates the funding plan for the Transbay Transit Center - TIFIA Loan Debt Service based on TIFIA loan agreement by $50.7 million and transfers $17.5 million in CMAQ funds from the AC Transit sponsored Enhanced Bus - Telegraph/Intl/East 14th project (ALA050017) to the new AC Transit - Operating Service project (ALA090051) conditioned on approval by MTC at its December 16, 2009 meeting of the reassignment of $35 million in CMAQ funds (MTC Resolution No. 3831, Revised). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-32
Approved

Admin Mod 46 $400,799 12-9-09
Letter
12-10-09
Letter
N/A
TIP revision 09-32 revises 46 projects with a net decrease in funding of approximately $401,000. The revision updates seven Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings and update the back-up list. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-31
Approved

Amendment 74 $23,763,429 11-18-09
Letter
12-9-09
Letter
1-7-10
Letter
Revision No. 09-31 is an amendment that revises 74 projects with a net increase in funding of approximately $23.8 million. The significant changes in the amendment are as follows: deletes 63 completed projects from the TIP (42 local streets and roads projects, 2 highway projects; and 19 transit projects); adds one new MTC managed grouped listing for New Freedom funds for FY08 and FY09 for large urbanized areas totaling $5.8 million; adds $6.4 million in ARRA TIGER funds to the AC Transit sponsored Zero Emission Bus Advanced Demonstration project; updates the funding plan for the San Mateo County Traffic Incident Management project to add $1M in RIP funds from the Willow Road Interchange project (SM010047); $500K in RIP funds, $2.3M in TLSP funds and $4M in Other Local funds; and updates back-up list and project cost of the Caltrans managed Grouped Listing for railroad crossings to include $6.6 million in Section 130 Funds in FY 2010. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-30
Approved

Amendment 48 $4,768,053 10-28-09
Letter
12-1-09
Letter
12-10-09
Letter
TIP Amendment 09-30 revises 48 projects with a net increase in funding of approximately $4.8 million. Among these changes, the amendment: 1) Deletes thirty completed projects from the TIP (twenty local streets and roads projects and ten transit projects) and the Golden Gate Transit project to replace 34 - 1991 40' TMC buses (MRN050023) because all the funds ($8,293,951 in FY 2009 Section 5307 funds and $2,073,488 of corresponding local match) are being transferred to the Facilities Rehabilitation Project (MRN050025). 2) Adds one new Caltrans managed SHOPP Grouped Listing for Highway Maintenance with four projects totaling $19.1 million. 3) Updates the back-up list and project costs of four Caltrans managed SHOPP Grouped Listings - Mandates and Prop 1B decrease by $52.9 million to remove a state cash funded project from the TIP, because it does not need federal reimbursement; Emergency response increases by $23.9 million due increase in construction costs for various projects; Collision Reduction increases by $17.9 million and Mobility decreases by $6.3 million. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-29
Approved

Admin Mod 58 $806,640 11-10-09
Letter
11-12-09
Letter
N/A
TIP revision 09-29 revises 58 projects with a net decrease in funding of approximately $807,000. Among other changes, the revision updates nine Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings and update the back-up list. Among other changes, the revision also updates 14 regional planning projects to reflect the commission approval of the STP/CMAQ programming for these projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-28
Approved

Admin Mod 25 $1,668,172 9-16-09
Letter
9-17-09
Letter
N/A
TIP revision 09-28 revises 25 projects with a net increase in funding of approximately $1.7 million. Among other changes, the revision updates 11 Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings and use the recent FTA operations flexibility. The revision also updates the funding plans of various projects including changes in the US 101 Doyle Drive Replacement project ($12.2M in CON phase funds being reprogrammed to ROW phase to address corresponding change in cost for the phases) and I-580 TriValley Corridor - EB HOV/HOT Lanes project ($7.5M in CON phase funds being reprogrammed to PE phase). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-27
Approved

Amendment 16 $57,660,000 9-23-09
Letter
9-28-09
Letter
10-27-09
Letter
TIP Amendment 09-27 revises 16 projects with a net decrease in funding of approximately $57.7 million. Among these changes, the amendment: Adds four new projects into the TIP (two planning projects, one bike project and one local road rehabilitation project); deletes two projects from the TIP: the Grand/MacArthur Blvd Corridor Improvements project because the funds are being used for the new Study Contra Flow Lanes on Bay Bridge project; and the Alameda-Oakland Ferry Main Street Barge project because the listing was a duplicate of an existing project; updates the back-up list and project costs of four Caltrans managed SHOPP Grouped Listings (Collision Reduction increases by $62.9 million with the addition of several projects, including safety projects on SR84 and SR152; Emergency Response increases by $43.2 million with the addition of several projects, including a safety project on Route 580; Bridge Preservation decreases by $151.2 million to remove duplicate programming in the back-up listing; Roadway Preservation decreases by $18.5 million); and updates the back-up list and project cost of the Grouped Listing funded with FTA 5307 ARRA funds for the Concord Urbanized Area to add operating assistance projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-26
Approved

Admin Mod 17 $3,553,253 8-20-09
Letter
8-20-09
Letter
N/A
TIP revision 09-26 revises 17 projects with a net decrease in funding of approximately $3.6 million. Among other changes, the revision updates six Grouped Listings funded with American Recovery and Reinvestment Act (ARRA) funds. These changes allow project sponsors to reinvest some of their cost savings. The revision also updates six Caltrans managed Grouped Listings. Another significant change in this revision is the update to the funding plan of the Sonoma Marin Area Rail Corridor project by removing $5 million in FTA section 5309 funds that were not allocated. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-25
Approved

Admin Mod 16 $6,218,251 8-6-09
Letter
8-10-09
Letter
N/A
TIP revision 09-25 makes revisions to 16 projects with a net increase in funding of approximately $6.2 million. Among other changes, the revision updates the project costs of thirteen regional planning projects to include STP or CMAQ funds and updates the local matching funds. The funding plan of AC Transit’s Preventive Maintenance program was updated to include $1.8 million in FTA 5307 funds transferred in from the AC Transit Facilities Upgrade project. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-24
Approved

Admin Mod 10 $1,465,021 7-23-09
Letter
7-23-09
Letter
N/A
TIP revision 09-24 makes revisions to 10 projects with a net decrease in funding of approximately $1.5 million. Among other changes, the revision updates the back-up list for the American Recovery and Reinvestment Act (ARRA) funded - San Mateo Local Streets and Roads Rehabilitation Projects Grouped Listing with a net decrease in funding of $4.4 million. The revision updates the project cost of the Santa Rosa Bus: Operating Assistance project to include $1.6 million in additional funds and updates the funding plan of the Doyle Drive project to reprogram $17.5 million in SHOPP Funds from FY 2006-07 to FY 2008-09. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-23
Approved

Amendment 85 $437,928,801 7-22-09
Letter
8-10-09
Letter
8-14-09
Letter
TIP Amendment 09-23 is an all transit TIP amendment that makes revisions to 85 projects with a net increase in funding of approximately $437.9 million. The amendment programs $350 million in FTA Section 5307 and FTA Section 5309 Fixed Guideway (FG) funds for FY 2009-10, as adopted by the commission through the San Francisco Bay Area Regional Transit Capital Priorities program. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-22
Approved

Amendment 19 $449,128,391

7-22-09
Letter

8-5-09
Letter

8-21-09
Letter
TIP Amendment 09-22 makes revisions to 19 projects with a net increase in funding of approximately $449.1 million. The amendment adds six new regional projects into the TIP funded with Other Local funds. The significant change in this amendment is the updated funding plan for the Transbay Terminal Project with an updated cost of $1.2 billion, with the funds being added in FY13 and FY14. The amendment also programs $70 million in American Recovery and Reinvestment Act (ARRA) funds to the Oakland Airport Connector project in FY09. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-21
Approved

Admin Mod 13 $2,146,482 7-13-09
Letter
7-13-09
Letter
N/A
Revision 09-21 is an administrative modification that makes revisions to 13 projects with a net increase in funding of $2.1 million. Among other changes, the revision updates the back-up lists and costs of four American Recovery and Reinvestment Act (ARRA) grouped listings. The significant change is the revision of the Caltrans managed grouped listing for Emergency Response projects. For six projects in this revision, the fund source is changed from CMAQ funds to STP funds due to the FY 2008-09 Rescission of CMAQ Apportionment. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-20
Approved

Amendment 18 $5,041,183 6-24-09
Letter
7-6-09
Letter
7-21-09
Letter
TIP Amendment 09-20 makes revisions to 18 projects with a net decrease in funding of approximately $5 million. The amendment adds seven new projects into the TIP: three transit projects (scheduled to receive part of the $15.3 million in American Recovery and Reinvestment Act (ARRA) funds), two new planning projects (funded with Other Local funds), one grade crossing design project (funded with TCSP earmarks funds) and one pavement overlay project (funded with SLPP funds and Other Local funds). The amendment also updates funding plans of the ARRA funded SHOPP projects to reflect actual obligations, at the request of Caltrans and among other changes, the amendment also changes the funding plan for the Doyle Drive Replacement Project as follows: it moves approximately $35 million from FY 2007-08 to FY 2008-09 for the Doyle Drive Replacement Project and changes the fund source for $80 million from Other Local funds to AB1171 funds. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-19
Approved

Admin. Mod 24 $12,048,719 6-29-09
Letter
6-30-09
Letter
N/A
Revision 09-19 is an administrative modification that makes revisions to 24 projects with a net increase in funding of $12 million. Among other changes, the revision updates the back-up lists and costs of seven American Recovery and Reinvestment Act (ARRA) funded grouped listings. The significant change is the revision of the Caltrans managed grouped listing for Bridge Preservation projects. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-18
Approved

Amendment 34 $76,464,607

5-27-09
Letter

6-18-09
Letter
7-8-09
Letter
Revision 09-18 is an amendment that makes revisions to a total of 34 projects with a net change in funding of $76.5 million. It adds 12 new projects into the TIP, including the SR 12/29/221 Soscol Junction Interchange (Flyover) Study project with $6.3 million in State funds; 10 regional planning projects; and a new TIP listing for the Pavement Technical Assistance Program (P-TAP). These were split from existing projects to mark the start of the new federal authorization period. One significant change in this amendment is the increase in costs of the Golden Gate Bridge - Suicide Deterrent System project, with $5 million in FY 2010-11 and $45 million in uncommitted funds in FY 2012-13. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-17
Approved

Amendment 28 $7,716,699 5-27-09
Letter
6-17-09
Letter
6-23-09
Letter
Revision 09-17 is an amendment that makes revisions to a total of 28 projects with a net decrease in funding of $7.7 million. The amendment is the Annual All Transit or Program of Projects (POP) TIP amendment that makes revisions to transit projects to reflect the FY 2008-09 appropriations that were enacted in March as part of the omnibus appropriations act and the apportionments of the FTA 5307 and 5309 Fixed Guideway programs to urbanized areas that were released by FTA on April 27. One significant change in this amendment is the addition of $12.6 million to the BART Car Replacement project. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-16
Approved

Admin. Mod 8 $6,794,240 5-22-09
Letter
5-27-09
Letter
N/A
Administrative modification 09-16 makes revisions to eight American Recovery and Reinvestment Act (ARRA) funded grouped listings with a net increase in funding of approximately $6.8 million. The back-up lists and costs of grouped listings are updated with this revision. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-15
Approved

Admin. Mod 41 $2,020,832 6-3-09
Letter
6-4-09
Letter
N/A
Revision 09-15 is an administrative modification that makes revisions to 41 projects with a net increase in funding of approximately $2.02 million. Among other changes, it updates project lists and costs of three Caltrans managed SHOPP Grouped listings. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-14
Approved

Amendment 27 $6,591,745 4-22-09
Letter
5-28-09
Letter
6-10-09
Letter
Amendment 14 makes revisions to a total of 27 projects with a net increase in funding of approximately $6.6 million. The amendment serves to update projects to reflect the revised Urban Partnership Program Agreement (UPA). Among other changes, the UPP Pre-Implementation project (SF-070044) was deleted from the TIP and the new Congestion Pricing Study and Coordination project (SF-090028) was added into the TIP. The revision also adds three other new projects into the TIP, two that program the new State Local Partnership Program funds and one that programs the FLHP funds received. The amendment deletes the Santa Rosa City Bus Route 19 /12 (SON070014) project as it was duplicated in the TIP and the Caltrain Fare Equipment Replacement project (SM-030029) as all the funds within the TIP period are being transferred to the Signal/Communication Rehabilitation & Upgrades project (SM-050041). The funding plan of the I-680 Sunol Grade - Alameda project (ALA991084) was updated to include $72 million in Proposition 1B SHOPP funds that were originally listed under the Grouped Listing - SHOPP - Mandated and Prop IB (VAR991009). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-13
Approved

Amendment 6 $17,137,154 4-22-09
Letter
5-27-09
Letter
6-10-09
Letter
Amendment 13 makes revisions to 6 projects receiving American Recovery and Reinvestment Act (ARRA) funds with a net change in funding of approximately $17.1 million. Among other changes, the amendment adds three new projects (Yountville SR 29 Bicycle Safety Improvements project - NAP090001, Pedestrian Signal Upgrades - SF-090029, and McGary Road Safety Improvements Project - SOL090004). The amendment also adds $10 million in ARRA funds to the Vasco Road Safety Improvements - Contra Costa project (CC-050030). The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-12
Approved

Admin. Mod. 21 $1,919,712 4-22-09
Letter
4-24-09
Letter
N/A
Administrative modification 09-12 makes revisions to 21 projects receiving American Recovery and Reinvestment Act (ARRA) funds with a net increase in funding of approximately $1.9 million. One significant change in this revision is the creation of the San Mateo County: Install TMS Elements (SM-090023) project by splitting the project originally listed in the SHOPP – Mobility Grouped Listing in the TIP (MTC050006) to allow for easier reporting and tracking of ARRA funds. The funding plan for the SR 24 - Caldecott Tunnel 4th Bore project was also updated by adding $104.957 million in State ARRA funds in FY09 in place of $31 million in RIP funds and $73.957 million in CMIA funds programmed in the TIP. The changes made with this revision will not affect the air quality conformity or conflict with the financial constraint requirements.

09-11
Approved

Admin. Mod. 2 $4,100,000 4-16-09
Letter
4-16-09
Letter
N/A
Administrative modification 09-11 makes revisions to two projects receiving State American Recovery and Reinvestment Act (ARRA) funds with a net increase in funding of approximately $4.1 million. The changes reflect the actions taken at the April California Transportation Commission meeting. The Marin US 101 HOV Gap Closure project (MRN990001) received $2.1 million in State ARRA-TE funds and $2 million in RIP funds in FY09. The funding plan for the SR 24 - Caldecott Tunnel 4th Bore project was updated by adding $92.7 million in State ARRA funds in FY09 in place of $2.7 million in IIP funds and $90 million in CMIA funds programmed in the TIP. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-10
Approved

Admin. Mod. 13 $7,871,342 4-10-09
Letter
4-13-09
Letter
N/A
Administrative modification 09-10 makes revisions to 13 American Recovery and Reinvestment Act (ARRA) funded grouped listings with a net decrease in funding of approximately $7.8 million. One significant change in this revision is the creation of a Grouped Listing for Highway Maintenance Projects receiving ARRA funds (REG090034) by splitting the project originally listed in the SHOPP – Roadway Preservation Grouped Listing in the TIP (MTC050009) to allow for easier reporting and tracking of ARRA funds. All other changes primarily updated the back-up lists and costs of grouped listings. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements.

09-09
Approved

Admin. Mod. 17 $13,711,731 4-09-09
Letter
4-13-09
Letter
N/A

Administrative modification 09-09 makes revisions to 17 projects with a net increase in funding of approximately $13.7 million. One significant change in this revision is the addition of four million dollars in FTA 5309 New Starts funds to AC Transit’s Enhanced Bus - Telegraph/International/East 14th project (ALA050017). The Caltrans managed Grouped Listing for State Highway Operations and Protection Program (SHOPP) – Emergency Response was updated to include three new projects in FY 2008-09 and one in FY 2009-10 with a net increase in cost of $2.4 million. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements.

Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-08
Approved

Admin. Mod. 6 $3,150,000 3-17-09
Letter
3-18-09
Letter
N/A
Administrative modification 09-08 makes revisions to 6 projects with a net change in funding of $3.15 million. The revision programs $132,298,000 in federal American Recovery and Reinvestment Act (ARRA) funds in place of existing funding and adds Highway Maintenance projects. Among other changes, the US-101 Doyle Drive Replacement project in San Francisco (SF-991030) received $50,000,000 in federal ARRA-SHOPP funding instead of later local funds to allow a segment of the project to be delivered sooner.

09-07
Approved

Amendment 26 $485,263,640 2-25-09
Letter
3-2-09
Letter
3-17-09
Letter
TIP Amendment 09-07 amends in 26 new grouped listings into the TIP with a net change in funding of $485.3 million in American Recovery and Reinvestment Act (ARRA) and local funds. This revision programs $395.1 million of the ARRA revenues amended into the TIP as part of Revision 09-05. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-06
Approved
related documents

Amendment 151 $12,507,578,454 4-22-09
Letter
5-12-09
Letter
5-29-09
Letter
Amendment #09-06 serves to conform the 2009 TIP to the new Transportation 2035 Plan for air quality conformity purposes. TIP Amendment 09-06 modifies approximately 17 projects and adds approximately 134 non-exempt projects with a net increase in funding of roughly $12.5 billion, including the addition of new projects as a result of recently approved voter initiatives, such as the Bay Area Rapid Transit District’s (BART’s)- Warm Springs to Silicon Valley with a total cost of $7.587 billion and Sonoma Marin Area Rail Corridor (SMART) project for $646 million; it adds the San Jose International Airport People Mover project for $512 million; adds the Freeway Performance Initiative for $222 million and adds the Bayview Transportation Improvements project for $126 million. The amendment also adds various Proposition 1B Trade Corridors Improvement Fund (TCIF) projects recently adopted by the California Transportation Commission (CTC); adds new projects approved by the CTC in the 2008 State Transportation Improvement Program (STIP), reconciles project costs to the new RTP (T-2035), and adds or deletes other air quality non-exempt projects consistent with the new RTP. The conformity analysis done for the Transportation 2035 Plan also serves to re-conform the entire 2009 TIP

09-05
Approved

Amendment 0 $1,188,148,640 2-25-09
Letter
2-26-09
Letter
3-17-09
Letter
Amendment 09-05 amends in the funding revenues for the American Recovery and Reinvestment Act (ARRA) to the tune of $1.18 Billion. This amendment adds in additional revenues only, to demonstrate financial constraint for the 2009 TIP. Several projects to be funded with ARRA funding are included in a companion Amendment 09-07.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-04
Approved

Amendment 64 $303,471,101

2-25-09
Letter

3-3-09
Letter
3-17-09
Letter
TIP Amendment 09-04 makes revisions to 64 projects with a net increase in funding of $303,471,101. Among other changes, it updates project lists and costs of several SHOPP Grouped listings. The amendment updates the funding plan to identify $35 million in CMAQ funds and advance these funds from outside the TIP period for AC Transit’s Enhanced Bus - Telegraph/Intl/East 14th project as part of the implementation of the Resolution 3434 Strategic Plan. It adds the High Street Bridge rehabilitation project back into the TIP and amends ten new projects into the TIP. Of these, four projects received FTA Transit in Parks Program (5320) grant funds and the revenues are accounted for as part of this revision. The amendment programs the second cycle funds of the Safe Routes to School grants into the TIP, adds in FY10 and FY11 funds into the Highway Safety Improvement Program and archives seven projects.

09-03
Approved

Admin. Mod 15 $361,802

1-29-09
Letter

2-10-09
Letter
N/A
Administrative modification 09-03 updates the project listing and funding for revisions to 15 projects with a net funding change of $361,802. One significant change in this revision includes combining the Doyle Drive Congestion Tolling project (SF-070043) into the Doyle Drive Replacement project (SF-991030), to reflect the changes made through administrative modification 07-28 which revised the 2007 TIP after the Commission had approved the 2009 TIP. Another change is to split the existing New Freedom Grouped Listing (REG070013) into three separate New Freedom (NF) grouped listings: NF FY06 Small UA (REG070013), NF FY07 Large UA (REG090004) and NF FY07/09 Small UA (REG090005) with updated project costs and lists to provide clarity.
Revision
(PDF)
Type
Number of Projects Net Funding Change MTC
Approval
Date
Caltrans
Approval
Date
FTA/FHWA
Approval
Date

09-02
Approved

Amendment 72 $28,081,615 12-31-08
Letter
1-7-09
Letter
1-23-09
Letter
Revision 09-02 is an amendment referred by the Programming and Allocations Committee on December 10, 2008.  It makes revisions to 72 projects with a net increase in funding of $28,081,615. Among other changes, it updates funding amounts to reflect changes made through Amendment 07-26 which revised the 2007 TIP after the Commission had approved the 2009 TIP. This amendment also reconciles STP/CMAQ funding that was obligated in FY 2007/08, modifies projects to reflect actions taken by the California Transportation Commission and makes adjustments to various grouped project listings at the request of Caltrans. Changes made with this revision do not affect the air quality conformity or conflict with the financial constraint requirements.

09-01
Approved

Admin Mod 29 $2,880,741 12-15-08
Letter
12-16-08
Letter
N/A
Revision 09-01 is an administrative modification approved by MTC's Executive Director under delegation of authority on December 15, 2008. It makes revisions to 29 projects with a net increase in funding of $2,880,741. Among other minor changes, it updates funding amounts, fund sources, project descriptions and project sponsors to reconcile with changes made through administrative modifications 07-27 and 07-28 which revised the 2007 TIP after the Commission had approved the 2009 TIP. Changes made with this revision do not affect the air quality conformity determination or conflict with financial constraint requirements.

Back to main TIP page