![]() |
|
||||||||||||
TRANSACTIONS NEWSLETTER ONLINENovember-December 2009
|
|||||||||||||
|
Raining sparks and glowing, the bridge takes on a Las Vegas quality in these nighttime glimpses of the round-the-clock effort to detach the old deck piece and secure the new bypass. (Photo: Noah Berger) |
|
|
The Bay Bridge is eerily empty. (Photo: Noah Berger) |
(Photo: Noah Berger) |
|
Crews help guide the massive deck piece as it slowly slides across tracks (in red) lubricated with dish soap. (Photo: Noah Berger) |
In a finishing touch, workers imprint the pavement with the new, slower speed limit in force along the bridge bypass. (Photo: Karl Nielsen) |
|
(Photo: Noah Berger) |
Viewed from underneath, the prefab bypass truss looks like a geometric modern art sculpture. (Photo: Noah Berger) |
|
(Photo: Tom Paiva) |
With the bypass in place, the disconnected stub of the
old East Span will be demolished |
|
Ironworkers ready one of the saddles that will ease the strain on the failed eyebar. (Photo: Karl Nielsen) |
In this aerial view, the old deck piece is sitting to the side, and the replacement truss (whitish colored) is starting to slide into place. (Photo: © 2009 Barrie Rokeach) See more photos at: http://www.mtc.ca.gov/projects/bay_bridge/closure.htm |
Contents
info@mtc.ca.gov • Report Web site comments • Accessibility Information • Site Help
Metropolitan Transportation Commission • 101 Eighth Street, Oakland, California 94607
Phone:
(510) 817-5700, Fax: (510) 817-5848
This page was last modified Tuesday September 07, 2010
© 2013 MTC